缓冲的设置和大小影响到整个生产系统的生产提前期和有效产出。
The lead - time and throughput of a total production system are influenced by the setting and size of buffers.
在前面定性分析基础上,分别建立生产型企业和销售型企业有需求提前期的库存优化模型,得出成本决策变量的最优解。
Based on the above qualitative analysis, it constructs an inventory optimizing model for manufacturer and storing company respectively, fingers out an optional result of the cost decision variable.
通过供应链物流整合,对按照订单生产(MTO)环境下汽车交付提前期(otd)的压缩问题进行了研究。
Through the supply chain logistics integration, the time compression of vehicle order-to-delivery (OTD) in the make-to-order (MTO) environment is researched.
研究了提前期不确定情况下总装生产物料需求计划的优化问题。
Research on Bill of Material and Material Requirements Planning in MRP System;
研究了提前期不确定情况下总装生产物料需求计划的优化问题。
Research on Bill of Material and Material Requirements Planning in MRP System;
应用推荐