这两种方法具有方便灵活、操作安全、抗干扰性强等优点,适合于现场验收试验和在线检测。
These two methods can be used easily, safely with good immunity to electromagnetic interference, therefore, they are suitable for on site testing and on line monitoring.
验收试验现场。
产品出厂后,负责从安装到用户调试验收,直到变电站正式投运的现场技术指导及处理现场问题。
Manufactured products, responsible to users from installation, commissioning acceptance until substation formal powerstation on-site technical guidance and treatment of the problem.
为保证配电自动化产品在用户验收阶段的产品质量,需要进行出厂试验(FAT)与现场试验(SAT),其中,馈线自动化测试是配电自动化系统试验的关键。
The factory acceptance test(FAT)and site acceptance test(SAT)of distribution automation system should be done before system putting into operation in order to ensure the product's quality.
局部放电试验是目前换流变现场最后,也是最有效的验收试验。
Localized discharge test is currently the final and most effective acceptance test in the converter site.
经过近年系统的试验研究,同条件强度验收的方法己渐趋完善,能够促进施工现场加强质量控制,保证工程质量。
Through the research recent years, the same condition strength method becomes perfect and good to strengthen the quality control of construction site, and guarantee structural quality.
经过近年系统的试验研究,同条件强度验收的方法己渐趋完善,能够促进施工现场加强质量控制,保证工程质量。
Through the research recent years, the same condition strength method becomes perfect and good to strengthen the quality control of construction site, and guarantee structural quality.