• 电气自动化系统设计软件编程设备成套供货现场安装调试

    The electricity automated system design, the software programming, the equipment complete set goods supply and scene peaceful installs the debugging;

    youdao

  • 变压器现场安装调试过程中应用调试方法,达到了预想效果

    During installation and commissioning, the commissioning method is adopted and gains the expected effect.

    youdao

  • 本文结合应用实例总结风机现场安装调试要点良好节能效果

    This paper sums up the main points of installation and shakedown test of the fan at site and its saving energy result combined with the application in a mine.

    youdao

  • 经过现场安装调试运行证明设计方案可行性精度满足该厂生产要求,达到了预期效果。

    By debugging and running, it shows the feasibility of design. And its accuracy meets the need of the factory's production and expectation.

    youdao

  • 该项研究经历现场调研测试评价分析确定改造方案安装调试现场试验等研究过程

    This research experienced on the process of on-the-spot investigation, testing and assessment analysis, confirming scheme of modification, installing and debugging and on-site experiments.

    youdao

  • 合同总价包括安装调试安装现场培训设备移交用户。

    The total price includes installation, commissioning of the analytical instrument and a basic training of its operation.

    youdao

  • 介绍了现场安装调试思路

    Introducing field installation, idea of testing.

    youdao

  • 系统开发阶段工厂信息采集系统(FIS)的集成商进行设计评估协助系统的现场安装调试

    Conduct design reviews with the Factory Information system supplier (FIS) during the system development phase and assist the system debugging and on-site installation.

    youdao

  • 所研制装置制造安装调试然后进行空载试车实际现场应用试验

    Developed the device manufacturers, installation, debugging, and then for no-load test and actual field test.

    youdao

  • 加工制作现场安装系统调试业主验收

    Manufacture, field installation, system debug, the owners of acceptance.

    youdao

  • 我公司工程师免费用户安装调试仪器进行现场操作培训

    Company engineers will be free for users to install equipment debugging and on-site operator training.

    youdao

  • 本文介绍安全基础知识,闸述了正确选用安全栅,以及安装现场调试安全栅注意事项

    This text introduces the foundation knowledge of the safe grid, the said the exactitude chooses to use the safe grid, and install with adjust to try the announcements of safe grid hour on the spot.

    youdao

  • 产品出厂后,负责安装用户调试验收直到变电站正式投运现场技术指导处理现场问题

    Manufactured products, responsible to users from installation, commissioning acceptance until substation formal powerstation on-site technical guidance and treatment of the problem.

    youdao

  • 主要工作业绩期间参与母液处理项目现场仪表安装PLC编程上位机调试(西门子s7- 300 +组态)。

    Main Achievements: Mother liquor during the water treatment project in the field of instrument installation, PLC programming, commissioning PC (Siemens S7-300 + configuration king).

    youdao

  • 现场条件成熟时,就要进行控制系统现场安装调试工作

    When the spot condition is mature, we will carry on the spot installation and debug of the control system.

    youdao

  • 链接测试工具信号强度LED显示屏缓和现场安装调试麻烦

    Link Test tool and signal strength LED display ease the trouble in site installation and debugging.

    youdao

  • 我方提供设备负责现场安装调试直至系统正常运行

    We will carry out the installation and debugging work to have t the system run normally.

    youdao

  • 我方负责现场设备安装调试工作直到设备整体正常运行

    Our responsible for on-site equipment installation, and commissioning work until the normal operation of equipment;

    youdao

  • 安装调试,供方现场服务人员业主及需方技术交底讲解示范将要进行程序方法

    E. before installation, for field service personnel to the owner and the demand side technology gives the low-down, explanation and demonstration to be carried out by programs and methods.

    youdao

  • 帮助用户安装调试现场培训操作人员保证机组真实环境下正常工作

    Help customers with their installations and running-in. Field train operators to make sure that the machine set can work well in real environments.

    youdao

  • 用户现场安装调试技术培训、技术咨询,常年用户提供公司生产一切产品部件、配件。

    To install in place, debug, technical training and consultation for clients, and supply all parts, fittings produced by us.

    youdao

  • 项目执行包括发运现场安装调试验收工作的组织和安排

    Project implementation, including delivery, site, testing and commissioning arrangement and so on.

    youdao

  • 论文工作包括上述试验台系统设计安装调试、操作保养规程的制订、运转以及现场实际检测误差分析等内容

    The work of the paper is composed of the systematic design, mounting, adjustment, service manual, test run, actual test, error analysis, etc of the test apparatus.

    youdao

  • 本文研发的露天煤矿设备故障诊断数据传输处理系统进行现场安装调试,初步使用正常

    This fault diagnosis data transmission and processing system for opencast coal mine management have been carried out on-site installation and testing, and it is working normally.

    youdao

  • 根据现场安装调试维护需要电源安装结构进行了设计

    According to on-site installation, commissioning and maintenance needs, the installation and structure of power supply design.

    youdao

  • 跟随机械服务工程师现场参加设备安装调试维修等工作筹备相关工作记录

    Visit customers together with Mechanical Engineer, take part in equipment installation, commissioning and maintenance, prepare and make record for relevant jobs.

    youdao

  • 供方派人免费指导设备安装调试负责培训现场操作工人

    Seller should be in charge of installation, debugging and training, of workers.

    youdao

  • 所有货物安装调试完毕客户查看验收后方可离开现场

    2 of all the goods after installation, check, acceptance by the customer before leaving the scene.

    youdao

  • 所有货物安装调试完毕客户查看验收后方可离开现场

    2 of all the goods after installation, check, acceptance by the customer before leaving the scene.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定