它可以为医院、银行、机场、军事基地、学校及家庭提供清洁、可靠的现场发电。
They are designed to provide a clean, reliable source of on-site power to hospitals, Banks, airports, military bases, schools, and homes.
这就意味着这些二氧化碳零排放的住房要包括各种现场发电,本文就需要实现这一点的技术变化进行了讨论。
It is implied that these zero-carbon homes will involve a range of on-site power generation, and the technological changes needed to achieve this are discussed.
拖车大小的绿色能源机器(GEM)是第一个用垃圾生产清洁能源的一体化现场装置,它能让商业停车场、大学和小镇自己发电。
The trailer-sized Green Energy Machine (GEM) is the first all-in-one, on-site device to produce clean energy from trash, letting business parks, universities and towns make their own power.
根据计算机模型得出的结果,这种设计可以让风力发电厂效率提高数百倍,下一步就是研究人员的现场测试,看“鱼儿”在陆地上的“游动”。
According to the computer model, this design could increase wind farm efficiency a hundredfold. The next step for the researchers is to do a field test, trying out these fish dynamics on dry land.
发电厂现场内的一个海水淡化厂提供给本厂所需的冷却水。
An on-site desalination plant means that the operation generates its own water for cooling.
从调查地质情况、钻测试井、获得开发许可到钻工作井和建设发电机组,现场的完全开发需要数年的时间。它也需要大量的资金。
It takes years to fully develop a site, from surveying the geology, drilling test Wells, receiving permits, drilling working Wells and building generators.
如欲预约从日内瓦欧洲广播联盟到最终目的地的现场链接,请与欧洲广播联盟计划处联系,电话:+4122 717 2900,或发电子邮件至 bookings@eurovision.net。
To reserve a live link from EBU Geneva to the final destination, please contact EBU planning at +41 22 717 2900 or send email to bookings@eurovision.net.
将影响系数法应用于水轮发电机转子现场动平衡,消除其振动故障。
The influence coefficient methods were applied in dynamic balance of hydrogenerator rotor at site to solve the vibration fault in this paper.
但是,安装海上风力发电机的一个缺点就是项目成本相对较高,原因是更严峻的现场条件和特殊环境所致的不易接近性。
However, a drawback of installing wind turbines offshore is the slightly higher project costs, caused primarily by the more challenging site conditions and limited accessibility.
目前大型汽轮发电机组轴系扭振特性的现场试验中广泛采用稳态不对称短路变频激振法。
Presently, the method of steady state unbalanced currents is widely used in the field test of torsional vibration characteristics of large-scale steam turbine generator rotor system.
为解决实验室环境中模拟风电现场进行风力发电研究的原动机问题,提出改造直流电动机模拟风力机的方案;
Then it brought forward the method of emulating wind turbine by DC motor to solve the prime motor issue for the study of wind power generating system in lab.
从现场实际出发,对火力发电厂电缆夹层防火设计方法与施工方式进行了探讨,针对设计与施工中存在的问题提出了解决方案。
The issue of anti-fire design and construction for cable interlayer in power plant is practically discussed. The problem in some design and solution is also presented.
讲述了发电机的随机识别参数模型和在现场测试的实践。
The model for random identification of generator parameters and on site testing practice are described as well.
通过理论计算和实际现场试验所得的参数,制定出龙羊峡水电站发电机组的进相运行曲线图。
According to the parameter getting through the theories calculation and the actual field experiments, the paper makes phase operation graph of generator in Longyangxia Hydropower Station.
采用比对测量和模拟发电机信号输出的方法,使新研制的便携式P MU现场测试仪能对现场的PMU进行校核。
By using comparing measurement and simulating power generator signal output, the new developed portable PMU field measuring instrument can calibrate the field PMUs.
发电机、变压器必需设在施工现场边角处,并设围栏和警示标志,保证用电安全。
Generator, transformer necessary construction site in corners, and a fence and warning marks, ensure safety.
介绍了现场CAN总线通讯以及在同步发电机励磁控制系统中的运用,并具体给出了利用AT 89 C52单片机和CAN控制器sJA 1000实现CAN接点通信的方法。
The scene CAN bus communication and its application to excitation system of synchronous generator was introduced, and the use of SBC AT89C52 and controller SJA1000 to realize junction communication.
本文提出了可靠性分析技术应用于汽轮发电机现场故障诊断的方法,旨在准确识别故障。
This peper presents a method of applying the reliability analysis technology to on site fault diagnosis of turbogenerators with the purpose of accurate identification of faults.
经现场实际测试,该设计方式能够满足全网发电机功角监测的实时数据处理要求。
Site test proves that this design meets the demand of phase angle measuring system for real-time data processing.
使用包括水用于冷却,调节湿度和发电现场。
Water usage includes water used for cooling, regulating humidity and producing electricity on-site.
现场应用动态无功补偿技术后,网络损耗有所减小,发电机输出功率大为降低,达到了节能降耗的目的。
After the applying of the technology, the network loss is decreased and the output power of the generator is lowered greatly, and energy saving with consumption declining is achieved.
岭澳核电发电机安装完成后,需要在现场做交、直流耐压试验,以检验发电机的绝缘特性。
The Ling'ao nuclear power generator should carry out the AC and DC withstand voltage tests to check the insulation performances of the unit after finishing the erection work on site.
根据SHEP - WM波形发生原理,设计和实现一种基于CPLD的SHEPWM数字触发电路。通过实际的现场实验,验证设计的正确性。
According to the generating theory of SHEPWM wave, a design of digital firing circuit on SHEPWM based on CPLD is implemented and correctness of design is verified by practical experiment.
发电机现场电源电路中的保护装置应能瞬时获得全泵房负荷?
Protective devices in the on-site power source circuits at the generator shall allow instantaneous pick-up of the full pump room load.
发电机现场电源电路中的保护装置应能瞬时获得全泵房负荷?
Protective devices in the on-site power source circuits at the generator shall allow instantaneous pick-up of the full pump room load.
应用推荐