正净现值标准—这个标准要求收益限制比任何已经投产的项目成本的现值大。
Positive net present value criterion — This criterion requires the present value of benefit to be larger than the present value of costs for any project that is to be undertaken.
最大净现值标准——资源应该分配成具有利用最大价值,如果从所有可能利用的资源中收获净效益。
Maximum net present value criterion — Resources should be allocated to those USES which maximize the value if the net benefits received from all possible USES of those resource.
然后得出基本情况,最好情况,最差情况下的净现值,再计算平均净现值和标准偏差,(粗略地)估计该项目的内部固有风险的大小。
Then obtain base-case, best-case, and worst-case NPV and calculate mean NPV and standard deviation to (roughly) estimate the magnitude of the risk inherent to the project.
现行法律规定的最高30倍的补偿标准偏低,建议参照项目预算的净现值方法计算,适当提高补偿标准。
Since current law' s regulation of at most 30 times is too low, the paper proposed to enhance the compensatory standard according to calculating method given out.
公路经营权是依托于公路的无形资产,对其转让可采用收益现值估价标准进行评估。
The highway management authority is an invisible assets based on highways and the transferring of it can be evaluated by the evaluating criteria of the present value of income.
从发行的净现值的财产,我们可以计算出预期净现值及其标准偏差。
From the distribution of the net present value of the property, one may calculate the expected net present value and its standard deviation.
本文重点探讨了自然灾害造成的人员死亡货币损失的估算方法,将个人未来收入的现值作为衡量损失大小的标准。
The authors emphasize on research for assessment on monetary loss of death from natural disasters, on the basis of "Capitalized value of man's earning capacity theory of western economic."
本文重点探讨了自然灾害造成的人员死亡货币损失的估算方法,将个人未来收入的现值作为衡量损失大小的标准。
The authors emphasize on research for assessment on monetary loss of death from natural disasters, on the basis of "Capitalized value of man's earning capacity theory of western economic."
应用推荐