他与BLM的新墨西哥主管杰西·尤恩一起参加了一个关于“环境影响报告书”的会议。
He attended a meeting concerning the EIS with the New Mexico director of BLM, Jesse Juen.
组织实施各项环境管理制度,按规定审定开发建设活动环境影响报告书;
To organize and implement every environmental management systems, examine influence report of development activities to environment;
环境影响报告书经批准后,计划部门方可批准建设项目设计任务书。
The department of planning shall not ratify the design plan descriptions of the construction project until after the environmental impact statement on the construction project is approved.
《国家环境政策法》中,“环境影响报告书”条款并没涉及司法实施。
The EIS provision in NEPA makes no reference to judicial enforcement.
根椐联邦和州的法律规定,在许多情况下都要求提供环境影响报告书。 媠。
Environmental impact reports are required under many circumstances by federal and state law.
此外,他们可能准备环境影响报告书和环境问题,如公共土地利用规划研究。
In addition, they may prepare environmental impact statements and studies on environmental issues such as public land-use planning.
如何评定环境影响报告书质量的优劣,这是实施环境影响评价制度的实际问题。
It is a practical problem during implementing Environmental Impact Appraisal System how to evaluate the quality of reports.
针对环境影响报告书工程分析编制的原则、方法和要点进行了探讨,同时提出了相应的建议。
This paper discusses the principles, methods and points about engineering analysis in report of EIA, at one time, corresponding propose is put forward.
除了在“环境影响报告书”中需要讨论“最坏情况”之外,原告们还认为机构忘记了采用合适的缓和计划。
Apart from the need for a "worst case" discussion in the EIS (discussed above), the plaintiffs also argued that the agency had failed to adopt an adequate mitigation plan.
首先,法院在法官的意见中表明,这种考虑可以作为颁布涉及每个矿场的单个“环境影响报告书”的一部分。
First, the Court indicated in dicta that this consideration could be made as part of the issuance of the individual EIS governing each site.
除了网站设计,景观建筑师选择网站建设,准备的成本数据,启动长期规划,选择实用走廊和编制环境影响报告书。
Besides designing sites, landscape architects select building sites, prepare cost data, initiate long-range planning, select utility corridors and prepare environmental impact statements.
这个表被包括在各个提议的核电反应堆的“环境影响报告书”里,作为环境影响个别化考虑的一个代用品。环境影响是指与反应堆有关的燃料循环活动带来的影响。
It was to be included in the eis for each proposed nuclear power reactor as a substitute for individualized consideration of the environmental effects of fuel cycle activities related to that reactor.
建设项目在投入生产或者使用之前,其环境噪声污染防治设施必须经原审批环境影响报告书的环境保护行政主管部门验收;达不到国家规定要求的,该建设项目不得投入生产或者使用。
Article 14 Facilities for prevention and control of environmental noise pollution must be designed, built and put into use simultaneously with the main part of a construction project.
建设项目在投入生产或者使用之前,其环境噪声污染防治设施必须经原审批环境影响报告书的环境保护行政主管部门验收;达不到国家规定要求的,该建设项目不得投入生产或者使用。
Article 14 Facilities for prevention and control of environmental noise pollution must be designed, built and put into use simultaneously with the main part of a construction project.
应用推荐