所述蜗壳由塑料材料制成,节约了物料成本。
The scroll casing is made of plastic materials and saves the material cost.
物料成本在很大程度上受世界市场燃料和矿产价格的制约。
Their materials costs are largely governed by prices on world markets for fuels and ores.
供应链管理是企业控制物料消耗,降低物料成本的一种有效管理方法。
Supply chain management is an effective way of controlling material consumption and reducing material cost for businesses.
负责年初标准成本的制定工作;包括标准物料成本,标准人工费率,标准机器费率; ;
Responsible E for standard cost setting for the coming year, including standard labor rate and machine rate;
人们花大量的时间与精力去优化库存(物料成本优化),但是效果却总是没有达到预期效果。
People took a large of time and energy to optimize the inventory (emphasize on material cost), however, the result didn't meet anticipation.
在印刷生产过程中,物料成本占去整体成本的比重,行家都心中有数;一旦获悉物料成本,便可快捷地为客户报价。
Paper cost contributes a known proportion to the overall production cost which in turn you could produce immediate quotations upon enquiries.
第四章尝试将粗糙集和神经网络应用于冷却塔的物料成本预估,探讨了基于粗糙集和神经网络的冷却塔的物料成本预估方法。
In chapter 4, the paper attempts to use rough set theory and Artificial Neural Network in the prediction of the material cost of the cooling tower.
如果希望某种技术在商业利用方面切实可行,首先在物料的预处理方面要求所得到的中间产品必须是容易发酵的糖份,产量高,浓度也较高,而且技术的实施成本还不能过高,还有生产过程中更不能使用有毒物质,不可以耗费太多能源,最后,所生产出来的草料油在价格方面必须能够与传统汽油一争高下。
They should not use toxic materials or require too much energy input to work. They must also be able to produce grassoline at a price that can compete with gasoline.
拆卸“的进一步过程是辨识每一个部件,然后计算其物料和组装成本。
The next steps in a teardown are identifying the parts and calculating the costs of materials and assembly.
他们对涉及建造方面的成本、价格、劳工及物料处理、财务、合约安排及法律等均有专门知识。
They possess expert knowledge of costs values Labour and materials process finance contractual arrangements and legal matters in the construction field.
更有效地管理物料清单,产品开发和制造成本,以改善产品的供应,平台和选择。
More effectively manage bill of material, product development and manufacturing costs to improve product offerings, platforms and options.
成本追踪在销售订单层,而不是物料层。
Costs must be tracked at sales order level and not on material level.
有些物料作为集合的需求被传送,这些物料从库存提取,成本来自当前的标准成本评估。
Other materials are carried as collective requirements. These materials are withdrawn from stock and the costs are taken from the current standard cost estimate.
在依照特殊的获取类型指定的物料部件被提取的工厂,系统搜索已经存在的成本数据并传送这些数据到成本核算中。
In the plant from which the material component is withdrawn according to the special procurement type, the system looks for existing costing data and transfers that data into the cost estimate.
对集中需求的物料,已经存在的成本核算数据被传递到新的成本核算中去。
For materials in collective requirements, the existing cost estimates are transferred into the new cost estimate.
这类项目的物料管理会直接影响项目成本和工程进度。
The management to these materials will affect directly project cost and process.
如果你是一个制造商,你有机会得到一个物料清单系统来确定标准件的成本。
If you are a manufacturer, chances are you have a bill-of-materials system to determine standard parts cost.
如果你眉宇激活跨公司成本核算,系统用物料记录中的价格。
If you have not activated cross-company costing, the system uses a price from the material master record.
对物料、能源等消耗定额进行测定、改进、论证和进行成本核算。
To measure, improve, demonstrate and carry out cost accounting for the consumption quota of material, energy and so on.
该工艺降低了锑白的生产成本,为高铋锑物料中锑的回收提供了新的途径。
The production cost be reduced by adopt this new process, provide new approach to recover antimony from antimony contained material with high bismuth.
如果你是一个制造商,你有机会得到一个物料清单系统来确定标准件的成本。
If you are a manufacturer, chances are you have a bill-of-materials (BOM) system to determine standard parts cost.
后勤成本控制是指对各部门办公用品、物料用品、水、电、煤气等使用情况的控制。
Logistics cost control refers to the department office supplies, materials, supplies, water, electricity and gas usage control.
在现有理论成果的基础上,分析物料清单(BOM)与标准成本核算的关系。
Analyzed the relation between BOM and standard costing on the base of theory.
可直接追踪及分摊到具体生产部门的物料及人工成本。
Variable material and labor costs that can be directly traced and allocated to a specific unit of production.
多阶段设备布局下的总成本包括设备拆装成本、物料搬运成本以及区域利用成本,问题的目标是最小化总成本。
The total cost under multi-stage facility layout contains the costs of facility re-location, material handling and area utilization, and the objective is to minimize the total cost.
产品成本分析包含物料清单,人工,费用,工具,及其他。
Product cost analyses, including detailed costed bills of material, labor and subcontract costs, tooling and other non-recurring charges.
合理布局作业单元可以使集货中心节约物料搬运费用,降低物流成本,提高作业效率。
Rational layout of the operation units in freight gathering center can reduce the costs of freight transport and logistics and increase efficiency.
另一方面,通过加强对物料的温度控制,可以减少能量的浪费,降低生产成本,提高挤出效率。
On the other hand, by improving the control of the melt temperature, it can distinctly reduce the waste of energy, pull the cost down and enhance the efficiency of extrusion.
机器实现了废料、木材或散装物料的低成本装卸。
The machine is well suited for the economic handling of scrap, wood or bulk materials.
机器实现了废料、木材或散装物料的低成本装卸。
The machine is well suited for the economic handling of scrap, wood or bulk materials.
应用推荐