• 位于大埔座滤水厂,以及深井滤水厂第二建筑工程正在进行

    Construction work for the two treatment works at Tai Po and Ngau Tam Mei and for the Sham Tseng treatment works Stage II was in progress.

    youdao

  • 另外包括田河上游、河道新田河道共约长24公里河道设计工作进行得如火如荼。

    Design work for another 24 kilometres of new river channels are under way, including the upper reaches of Kam Tin river, Ngau Tam Mei drainage channel and San Tin drainage channel.

    youdao

  • 另外包括田河上游、河道新田河道共约长24公里河道设计工作进行得如火如荼。

    Design work for another 24 kilometres of new river channels are under way, including the upper reaches of Kam Tin river, Ngau Tam Mei drainage channel and San Tin drainage channel.

    youdao