这些石墨块事实上是燃料组件。
这些高且瘦的塔器就是燃料组件。
这是燃料组件的典型标准。
堆芯采用平板式燃料组件。
把几个燃料组件放到核反应堆的中心,释放的能量会更高。
Put several fuel assemblies into the core of a nuclear reactor, and the amount of energy released gets even higher.
这个问题是,如果它进入到核心,它可能会堵塞到一些燃料组件。
The issue basically is if it goes into the core it could obviously block some fuel assemblies.
芯块进入燃料元件,在那里燃料元件是,组合成燃料组件,就在那。
Pellets go into fuel pins where the fuel pins are assembled into fuel assemblies, which is right here.
燃料组件通常位于20至30英尺的水下,使其沸腾需要几天时间。
The fuel assemblies usually lie under 20 to 30 feet of water, which would take days to boil away.
通过堆芯内燃料组件互换来搜索功率峰因子最小的燃料装载格式。
The search for an optimum loading pattern with the smallest radial power peak by exchanging fuel assemblies was made.
核电站起重机器人可用来装卸、搬运乏燃料组件等对人体有害的物体。
The manipulator crane used in NPP can be used for refueling and transporting spent fuel assemblies harmful to one's health.
废燃池冷却系统用于导出乏燃料组件的衰变热,同时净化乏池内的水质。
The spend fuel pit Cooling System is designed to remove the decay heat generated by stored spend fuel assemblies and to purify the water in the spent fuel pit.
本实用新型涉及核燃料元件领域,具体涉及一种压水堆燃料组件上管座。
The utility model relates to the field of nuclear fuel components, in particular to an upper tube seat of a pressure water reactor fuel element.
对于压水堆燃料组件而言,栅格稠密、几何形状复杂,对中子的吸收较强。
Considering fuel assembly for PWR, it is possessed of dense lattice, complex geometry and strong absorption of neutron.
讨论了用穿透概率法求解二维六角形几何轻水堆燃料组件中子通量的分布。
The flux distribution of two dimensional hexagonal geometry fuel assembly for LWR is studied, using the transmission probability method.
研究利用穿透概率法求解二维六角形轻水堆燃料组件内中子通量密度分布。
The paper describes the model for calculating the neutron flux density distribution in two dimensional hexagonal geometry assembly of light water reactor (LWR) by transmission probability method.
试验结果表明:随着激励振级加大,板状燃料组件的第一阶共振频率减小;
As excitation magnitude increases, the 1st resonant frequency of the parallel plate fuel assembly decreases.
PWR燃料组件定位格架用材从镍基合金转变为锆-锡合金颇有经济意义。
The change of spacer grid material from Ni-base alloy to Zircaloy has economical value.
本文介绍了秦山核电厂一期工程1:1燃料组件高温高压冲刷实验压力容器的设计。
This paper briefly introduces the design of the pressure vessel for full-scale fuel assembly scouring tests in high temperature and pressure for Qinshan NPP-1.
核燃料组件是由圆柱状的二氧化铀芯块做成的燃料棒,然后按照一定顺序组装起来。
Fuel assembly is a cylindrical pellets made of uranium dioxide fuel rods, and then assembled according to a certain order.
你们能看到蓝辉光,在切伦科夫,辐射里,新的燃料组件从,反应堆里出来,它们会在水里放射。
And you can see blue glow to the Cherenkov radiation that fresh fuel assemblies coming out of the reactor would emit in the water.
大约有10个是堆放在核心的地方,还有,我不记得具体有多少,但是这些已经变成了燃料组件。
About ten of these are stacked high in the core and there's I don't recall exactly how many but these become the fuel assemblies.
有大约86000公斤的铀,在核心,还有,有大约193,的燃料组件,在这个典型的例子中。
And there's about eighty six thousand kilograms of uranium in the core. And again, there are about a hundred and ninety three fuel assemblies in this typical example.
同时,在四角位置分别对称布置定位销孔,从而使压水堆燃料组件的安装更加灵活方便。
Meanwhile, the four corners are respectively and symmetrically provided with positioning pin holes, so that the assembly of the pressure water reactor fuel element can be more flexible and convenient.
介绍了NHR -10组件内钆可燃毒物配置、堆芯燃料组件布置和换料方案的改进设计。
This paper introduces the improved NHR 10 core design which includes the arrangement of the gadolinium burnable poison (BP), the fuel assembly arrangement and the fuel assembly reloading scheme.
大亚湾核电站第十循环堆芯是自提高燃料组件富集度后实现18个月燃料循环的第二个循环堆芯。
The tenth cycle core of GNPS is the second cycle with 18-month fuel cycle after increasing fuel enrichment.
指暂时将核反应堆停止操作,以对厂房设备进行维护及大修,并包括更换部份已消耗的铀燃料组件。
Refuelling outage A temporary shutdown of the nuclear reactor unit for carrying out maintenance and overhaul of plant and equipment including the replacement of a portion of used fuel.
计算得到了额定工况下标准燃料组件内各个冷却剂通道的流量分布和不等间隙通道燃料板两侧压差。
The flow distribution and pressure difference of different coolant channels in the standard fuel assembly at rated operating condition are reached.
现在,在这个区域里,最重要的事情是,理解热量转化,从燃料组件中,到冷却剂,无论冷却剂是什么。
Now, in this area the most important thing is understanding the heat transfer from the fuel assemblies to the coolant, wherever that coolant is.
破损燃料组件定位检测系统是为了确保反应堆安全运行、及时处理燃料包壳破损事故的安全重要设备。
The failed fuel assembly identification system is an important safety system which ensures safe operations of reactor and immediate treatment of failed fuel rod cladding.
破损燃料组件定位检测系统是为了确保反应堆安全运行、及时处理燃料包壳破损事故的安全重要设备。
The failed fuel assembly identification system is an important safety system which ensures safe operations of reactor and immediate treatment of failed fuel rod cladding.
应用推荐