• 焦炭延迟焦化装置关键设备

    Coke drum is the key equipment of the delayed coking device.

    youdao

  • 论述了焦炭保温重要性

    The importance of thermal insulation for coke drum was discussed.

    youdao

  • 焦炭延迟焦化装置重要设备之一

    Coke Tower is one of the important equipment for the delayed coking device.

    youdao

  • 焦炭处理解决“三泥”出路。

    The "three sludge"problem can be settled by using a coke tower to dispose the "three sludge".

    youdao

  • 求解控制方程得到焦炭塔筒体内力位移

    Solving the control equation, the inner force and displacement can be got.

    youdao

  • 由此断定焦炭鼓胀变形渐次塑性变形积累的结果

    Therefore, we come to the conclusion that the deformation of coke drum is the result of progressive plastic deformation.

    youdao

  • 并以腰鼓变形是否超过临界值作为焦炭判废标准之一。

    One of criteria for coker drum invalidation is whether the loin-drum deformation has exceeded the critical value.

    youdao

  • 焦炭剩余寿命评估延迟焦化装置安全生产奠定基础

    Residual life evaluation establishes a foundation of safety production of delay coking unit.

    youdao

  • 苛刻的作业工况下焦炭运行若干年出现体鼓胀变形

    In slashing running conditions, the bulging deformation of coke drums may appear after some years.

    youdao

  • 评估结果认为焦炭剩余使用寿命疲劳试验结果决定的。

    From evaluation, it is believed that residual life of coke drum is decided by the result of fatigue test.

    youdao

  • 焦炭裙座焊缝环向开裂现役焦炭塔普遍存在一种严重缺陷

    The circumferential cracking of the skirt weld is a serious defect, which commonly exists in the coke tower in service.

    youdao

  • 分馏焦炭压缩机热设备也作了相应的技术改造。

    The fractionator, coke tower, wet gas compressor and the heat exchangers were transformed correspondently.

    youdao

  • 分析了焦炭受力情况产生疲劳破坏主要原因认为焦炭下部裙座和筒体结构不连续主要原因。

    Stress on the coke drum and the main cause of fatigue rupture creation has been analyzed and it is held that un-connected structure of the skirt and coke drum is the main cause.

    youdao

  • 焦炭延迟焦化装置中的关键设备之一,由于操作条件苛刻,使焦炭塔受到循环往复的应力的作用。

    Coke tower is major equipment in delay-coking unit. but due to the severe service conditions, coke tower is loaded recling thermal stress and pressure.

    youdao

  • 我国,一般通过研究高温状态下运行延迟焦化装置焦炭塔20号锅炉程度来评定焦炭塔使用寿命,成为工程界常用的检测方法。

    It has become a normal practice to estimate coker drum's service life by the extent of spheroidization of 20g steel in delayed coker operating at high temperatures.

    youdao

  • 通过实验测定清水餐厅污水组合型填料焦炭填料中曝气过程溶解氧变化规律

    The oxygen transfer characteristics of combined packing or coke packing in water or restaurant wastewater were investigated by parallel experiments.

    youdao

  • 沿轨道快速高炉移动淬火用水喷淋焦炭。把面包放在烤箱里烤脆。

    The coke car moves quickly from the oven end along rails into a quench tower and the coke is sprayed with water.

    youdao

  • 沿轨道快速高炉移动淬火用水喷淋焦炭

    The coke car moves quickly from the oven end along rails into a quench tower and the coke is sprayed with water.

    youdao

  • 沿轨道快速高炉移动淬火用水喷淋焦炭

    The coke car moves quickly from the oven end along rails into a quench tower and the coke is sprayed with water.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定