• 黄河沙坡头水利枢纽的水轮机黄河中游径流水电站第一个采用大型灯泡水轮机

    The Shapotou Control Project is the first power station where large through flow type turbine generator units were installed among the hydropower station at middle reaches of the Yellow River.

    youdao

  • 黄河沙坡头水利枢纽的水轮机黄河中游径流水电站第一个采用大型灯泡水轮机

    The Shapotou Control Project is the first power station where large through flow type turbine generator units were installed among the hydropower station at middle reaches of the Yellow River.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定