对该地基采用了强夯加固、在强夯地基上打桩、振动碎石桩和混凝土灌注桩多种地基处理方法。
The method includes the forced ram, piles driving on the ramed ground, vibrating crushed stones piles and injecting concrete piles etc.
对该地基采用了强夯加固、在强夯地基上打桩、振动碎石桩和混凝土灌注桩多种地基处理方法。
The method includes the forced ram, piles driving on the ramed ground, vibrating crushed stones piles and injecting concrete piles etc.
应用推荐