• 也许使用瀑布开发方法或者已经采用Agile

    Perhaps you are using waterfall development methods, or perhaps you've adopted Agile.

    youdao

  • 尽管瀑布开发方法缺点受到广泛批评但是仍然非常流行

    Notorious weaknesses in the waterfall development method have been widely criticized, yet the method still remains very popular.

    youdao

  • 使用瀑布开发方法将会产生大量部分完成工作因为大量时间改善需求设计之上。

    Using the waterfall development approach leads to lots of partially done work, because a lot of time is spent upfront in elaborating requirements and in design.

    youdao

  • 瀑布开发过程设计同时交付所期望所有能力 ——一种开发中到大型复杂系统无效方法8

    Waterfall development processes are designed to deliver all desired capability at the same timean ineffective approach for developing medium-to-large complex systems 8 .

    youdao

  • 如果项目主要网络重新设计或者个只有少许软件开发服务器固化的项目,传统瀑布方法也许更好

    If your project is mainly a network redesign or a server consolidation project with very little software development, you might be better sticking with a traditional waterfall approach.

    youdao

  • RMC支持基于不同开发方法过程用于定义不同的生命周期模型例如瀑布递增迭代生命周期模型。

    RMC supports processes based on different development approaches and can be used to define different lifecycle models such as waterfall, incremental, or iterative lifecycles.

    youdao

  • 瀑布开发方法可以好地工作

    The waterfall approach to development would work just fine.

    youdao

  • 因此随后开发方法不是典型瀑布方案,在瀑布方案中,收集需求之后进行分析设计进行系统的实现。

    Hence, the development approach that is followed is not the classic "waterfall" scenario, where requirements gathering is followed by analysis and design, leading to the implementation of the system.

    youdao

  • 然而,使用瀑布开发方法执行与想象相反很多设计团队阶段1之后的修改设计视为他们的最初设计或者需求过程失败

    However, that runs counter to the thinking behind the waterfall approach: Many design teams would view modifying the design after Stage 1 as a failure of their initial design or requirements process.

    youdao

  • 记住需要项目活动进行迭代;传统瀑布系统开发方法风险经常要多,特别对于大型复杂项目更是如此。

    Keep in mind that the project activities need to be iterative; the traditional waterfall approach to system development is prone to much higher risk, especially for large and complex projects.

    youdao

  • 虽然一个改进瀑布开发方法并不排除反馈使用但是它没有促进支持鼓励反馈的使用。

    And although a modified waterfall approach does not preclude the use of feedback, it does not facilitate, accommodate, or encourage it.

    youdao

  • 顺序开发(例如瀑布开发模式)问题强制设计人员采用深度优先广度优先方法

    The problem with sequential development (for example, waterfall) is that it forces designers to take a depth-first rather than a breadth-first approach.

    youdao

  • 以及这些对于预算意味着什么?可以敏捷开发作出这些重要评估但是这种思考方式瀑布方法中的思考方式不同

    These important types of assessments can be made with agile development, but it’s a different way of thinking than you might be used to with waterfall methodologies.

    youdao

  • 最后最小化风险不要使用一个典型瀑布方法驱动开发项目

    And finally, the desire to minimize risk does not typically drive a waterfall project.

    youdao

  • ASDI唯一棘手问题他们最初预期项目应该严格按照瀑布型的开发方法进行

    The only tricky issue with ASDI had been their initial perception that the project should be undertaken according to a strict waterfall-type approach.

    youdao

  • 我们项目开发瀑布法转RUP方法许多支持项目子项目同时进行

    On all of our projects that were going from waterfall to RUP, there were a number of supporting projects and subprojects going on concurrently.

    youdao

  • 避免瀑布开发方法

    Avoid waterfall development approach.

    youdao

  • 相反工作瀑布开发方法中的开发人员典型被限制在狭窄的技术专长上,并且仅仅机会从事设计编码或者测试之一方面的工作。

    In contrast, those working on waterfall projects are typically confined to narrow specialties and have only one shot at design, coding, or testing.

    youdao

  • 实际上多数开发团队使用改进的瀑布开发方法,他们项目分解成为两个或者更多部分有时这些部分被称为阶段或者是时期。

    In practice, most teams use a modified waterfall approach, breaking the project down into two or more parts, sometimes called phases or stages.

    youdao

  • 瀑布方法其中第一这样被定义系统开发过程

    The Waterfall methodology was one of the first such defined system development processes.

    youdao

  • 迭代软件开发项目评估活动瀑布方法主要不同之处

    The key differences in estimation activities on an iterative software development project versus one governed by a waterfall approach are.

    youdao

  • 下面图片使用瀑布方法螺旋方法迭代过程中的任何一方法来描述当前开发环境

    The following graph demonstrates the current development environment, using any of the Waterfall, Spiral or Iterative processes.

    youdao

  • 后来美国国防部意识瀑布方法行不通的,并最终1994年发布了取代DOD-STD - 2167的标准MIL - STD - 498,支持迭代式开发

    Eventually, the DOD realized that the Waterfall method was not working and in 1994 replaced DOD-STD-2167 with MIL-STD-498, which supports iterative development.

    youdao

  • 长治市科技计划网上申报系统开发方法是以“瀑布模型框架为主,以“原型”为辅而研制的新系统。

    The online declaration system of sci-tech plan of Changzhi City takes waterfall model as main framework and takes prototyping method to research the system functional modules.

    youdao

  • 系统采用了基于B/S三层体系结构利用瀑布模型生命周期方法学进行软件开发

    The proposed system design is based on B / S of the three-tier architecture, using waterfall model that is the life cycle methodology developed.

    youdao

  • 顺序开发例如瀑布开发模式问题强制设计人员采用深度优先广度优先方法

    The problem with sequential development (for example, waterfall) is that it forces designers to take a depth-first rather than a breadth -first approach.

    youdao

  • 顺序开发例如瀑布开发模式问题强制设计人员采用深度优先广度优先方法

    The problem with sequential development (for example, waterfall) is that it forces designers to take a depth-first rather than a breadth -first approach.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定