溪洛渡工程建设风险要引起重视,管理手段要更加精细。
The Engineering venture of Xiluodu project shall be attached importance to and ladder of management should be finer.
向家坝、溪洛渡两电站为金沙江开发的第一期工程。
Xiangjiaba and Xiluodu hydroelectric stations will be the first stage works of developing the Jinshajiang River.
从溪洛渡水电站工程的重要性及混凝土耐久性方面考虑,工程应严格控制水泥的碱含量及混凝土中的总碱量。
Taking into consideration of importance of Xiluodu project and concrete durability, alkali content in cement and total alkali content in concrete must be limited strictly.
溪洛渡、向家坝水电站是开发金沙江水能资源的重点工程。
The Xiluodu and Xiangjiaba hydroelectric stations are the key projects of developing the Jinsha River hydropower resources.
针对溪洛渡水电站导流洞衬砌混凝土工程,采用三维有限元法分析了围岩变形模量变化对温度应力影响的敏感性。
In view of the lining concrete engineering of Xiluodu hydropower station, 3-dimensional finite element method is used to analyze thermal stress sensitivity of the surrounding rock deformation modulus.
溪洛渡电站装机1260万千瓦,相当于4个二滩电站,其工程综合技术难度位居世界前列。
The total installed capacity of Xiluodu hydropower station amounts to 12600MW that is 4 times of Ertan station, and its comprehensive technical difficulty is on top of the world.
在此基础上确定了溪洛渡—株洲特高压直流输电工程换流变压器的额定功率、电压、电流和分接头的变化范围等参数。
After illustrating the operation theory of six pulse converter, author gives the calculating method of UHVDC transmission parameters such as operating power, voltage, current and tap changer range.
在此基础上确定了溪洛渡—株洲特高压直流输电工程换流变压器的额定功率、电压、电流和分接头的变化范围等参数。
After illustrating the operation theory of six pulse converter, author gives the calculating method of UHVDC transmission parameters such as operating power, voltage, current and tap changer range.