• 利用大型向六自由度地震模拟振动台,对我国三峡工程溢流坝进行动力模型试验

    Dynamic model test of overflow dam section of Three Gorges Project was carried out on a large-scale vibration actuating system.

    youdao

  • 计算中,溢流坝段其它部位结构相连接处采用协调网格,并且应用局部非协调网格协调位移解法进行计算

    In the calculating, the local incompatible mesh was adopted at the joint of the pier and other structure, then apply compatible displacement method of local incompatible mesh to calculate.

    youdao

  • 甫渡水电站大坝溢流坝4个中为宽尾墩,配备4套液压滑升模板,4个宽尾墩混凝土浇筑同步施工满足施工进度计划安全度汛节点工期要求

    The concreting work of the 4 flaring piers was done simultaneously, which satisfied the requirements of both construction schedule and safely tiding over the flood period.

    youdao

  • 万安水电站二期主体工程溢流6 ~15坝段左岸溢流5坝段部分采用碾压混凝土筑坝技术。

    Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.

    youdao

  • 万安水电站二期主体工程溢流6 ~15坝段左岸溢流5坝段部分采用碾压混凝土筑坝技术。

    Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定