利用大型三向六自由度地震模拟振动台,对我国三峡工程溢流坝段进行了动力模型试验。
Dynamic model test of overflow dam section of Three Gorges Project was carried out on a large-scale vibration actuating system.
在计算中,溢流坝段闸墩其它部位结构相连接处采用非协调网格,并且应用局部非协调网格协调位移解法进行计算。
In the calculating, the local incompatible mesh was adopted at the joint of the pier and other structure, then apply compatible displacement method of local incompatible mesh to calculate.
居甫渡水电站大坝溢流坝段4个中墩为宽尾墩,配备4套液压滑升模板,4个宽尾墩混凝土浇筑同步施工,满足了施工进度计划和安全度汛节点工期的要求。
The concreting work of the 4 flaring piers was done simultaneously, which satisfied the requirements of both construction schedule and safely tiding over the flood period.
万安水电站二期主体工程溢流坝6 ~15坝段、左岸非溢流坝5坝段和左导墙部分拟采用碾压混凝土筑坝技术。
Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.
万安水电站二期主体工程溢流坝6 ~15坝段、左岸非溢流坝5坝段和左导墙部分拟采用碾压混凝土筑坝技术。
Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.