并在应用需要调研的基础上,给出了湛江电厂的生产过程实时监控系统设计方案。
Then we present a design plan for the real-time monitoring system of production process of Zhanjiang Power Plant according to the investigation into practice requirement.
湛江发电厂2号灰渣泵房冲洗水泵电动机在运行中出现外壳温度过高现象。
The sluicing pump motor in No 2 ash pumphouse of Zhanjiang Power Plant experienced over temperature on its case during operation.
主要介绍了双工质电液并存DEH系统在湛江发电厂300MW机组运行中存在的主要问题。
The subsistent main problems in the double material electricity and hydraulic coexisting DEH system of Zhanjiang power plant 300MW Units are described.
叙述了湛江发电厂3号机组a汽动给水泵汽轮机2号瓦振动问题的分析及处理的整个过程,指出造成2号瓦振动大的主要原因是不平衡及轴瓦刚性差。
This paper presents the vibration analysis and treatment of No. 2 bearing of the steam turbine for Unit 3 turbine driven feed water pump a in Zhanjiang Power Plant.
叙述了湛江发电厂3号机组a汽动给水泵汽轮机2号瓦振动问题的分析及处理的整个过程,指出造成2号瓦振动大的主要原因是不平衡及轴瓦刚性差。
This paper presents the vibration analysis and treatment of No. 2 bearing of the steam turbine for Unit 3 turbine driven feed water pump a in Zhanjiang Power Plant.