大体积混凝土结构基础设计和施工中裂缝、预埋件等的控制是工程界的热点。
The design of the bulk concrete structure for foundation and control of the cracks as well as embedded parts in construction are focuses in the engineering circle.
本文通过6个试件,对钢桁架与混凝土核心筒之间采用单剪板连接时节点预埋件的不同构造方案进行了低周反复加载试验研究。
Cyclic loading tests of 6 specimens were carried out to investigate the performance of different details of embedded anchors for the single-plate connection between steel trusses and concrete walls.
针对钢筋混凝土结构预埋件在计算方面存在的问题,进行了75组212件不同类型试件的试验。
To evaluate the problems existing in the calculation of built-in fittings in reinforced concrete structures, 75 series of tests consisting of 212specimens of various forms were made.
本发明公开了避免金属预埋件焊接高温烧坏混凝土基层的装置和方法。
The invention discloses a device for preventing high temperature caused by welding metal embedded parts from burning out concrete base layers and a method thereof.
本发明公开了避免金属预埋件焊接高温烧坏混凝土基层的装置和方法。
The invention discloses a device for preventing high temperature caused by welding metal embedded parts from burning out concrete base layers and a method thereof.
应用推荐