根据证实后的核心混凝土与钢管之间的相互作用的力学机理,建立钢管混凝土支架的计算方法;
Basis on the interaction mechanics mechanism between the key concrete and the steel tube that can be confirmed , establish the calculation method of the concrete filled steel tube support;
直接将绝缘铜管母线固定在钢构架上或混凝土支架上,取消穿强套管和支柱绝缘子,具有较强的抗震动能力。
Fix insulated copper tubular busbar on the steel framework directly and remove wall bushing and supporting insulator. It has strong vibration resistance.
问题在于,他还没来得及把支架弄到合适的高度,混凝土就凝固了,他把自己弄了一身的油漆。
Only problem was the concrete hardened before he could get the post sunk to the right height. And he got paint all over himself.
在箱梁上搭设支架,分段浇筑桥塔混凝土。
Erect support on box girder perform segmented concreting of bridge tower.
由于边拱具有不对称性,因此浇注边拱混凝土时现浇支架将承受巨大的水平推力。
Because of asymmetry of side arch, the support for casting will bear tremendous horizontal thrust when placing side arch concrete.
将安装在支架台车上的整体模板在洞身轨道上逐段前移,逐段浇筑墙身混凝土。
Overall template installed on support vehicles is moved along the cave channel and poured walls concrete paragraph by paragraph.
本文结合上海市青浦区蒸浦大桥施工实践,简要介绍了钢筋混凝土系杆拱桥无支架施工的工艺。
In the light of the construction practice of Zhengpu bridge in Qingpu District, Shanghai the paper introduces the process of construction without supports of reinforced concrete tied arch bridge.
同时对钢支架的应力进行监测,得出钢管混凝土柱始终处于严重偏心受压状态的结论。
In addition, the stresses on steel frames were also monitored by strain gauges the conclusion that the steel-pipe concrete columns seriously suffer eccentricity press was obtained.
重点阐述了陆家埝大桥薄壁空心高桥墩双曲可调模板及支架系统以及泵送混凝土施工工艺。
The paper focuses on the adjustable reversible form and its support system and the pumped concrete technology for high thin-walled hollow piers of Lujianian Bridge.
在钢管混凝土系杆拱桥系梁支架搭设施工中,支架基础的承载能力和支架自身的稳定性是工程的关键。
The foundation's bearing capability under the bearing bracket and the stability of the bearing bracket are the key points in the construction of the under supporting steel pipe concrete arch bridge.
而在实际结构中,有很多的混凝土柱属于双向偏心受压,如管道支架和水塔的柱子,在地震区的多层框架柱等。
The actual structure, there are a lot of concrete columns are two-way eccentric, such as pipelines and cooling towers that support pillars, in the earthquake zone such as multi-storey frame columns.
研究目的:预应力混凝土连续梁采用满布支架施工时,常常因为现场浇注的混凝土量过大,而不得不分段进行施工。
Research purposes: the segmental casting method is often used in the full framing construction of prestressed concrete continuous girder because concrete casting in-site is too much.
研究目的:预应力混凝土连续梁采用满布支架施工时,常常因为现场浇注的混凝土量过大,而不得不分段进行施工。
Research purposes: the segmental casting method is often used in the full framing construction of prestressed concrete continuous girder because concrete casting in-site is too much.
应用推荐