龙滩大坝混凝土运输供料线系统由拌和楼出料皮带机和系统连接皮带机、3条高速皮带机供料线、3条负压溜槽和2台塔式布料机组成。
The concrete delivery system for the dam is composed of mixer feeding conveyer, system connecting conveyer, 3 high-speed belt conveyer lines, 3 vacuum-chutes and 2 sets of tower crane placers.
连续包装被供给到传送带、集料带、罐车、称料斗、拌和车、或预混机(15)上,其中,包装被打开并将纤维投配到混凝土中。
The continuous package is fed to a conveyer belt, an aggregate belt, a skip, a weigh hopper, a truckmixer, or a premixer (15), wherein the package is opened and the fibres are dosed into the concrete.
连续包装被供给到传送带、集料带、罐车、称料斗、拌和车、或预混机(15)上,其中,包装被打开并将纤维投配到混凝土中。
The continuous package is fed to a conveyer belt, an aggregate belt, a skip, a weigh hopper, a truckmixer, or a premixer (15), wherein the package is opened and the fibres are dosed into the concrete.
应用推荐