• 古城大桥座下承式承载钢管混凝土系杆截面连续组合体系

    Gucheng bridge is a steel tube concrete bowstring arch and variable cross section continuous beam composite system through bridge with single load plate.

    youdao

  • 该线大量采用张法预应力混凝土双线支箱

    A great amount of post tensioned pre-stressing concrete single box beam for double track (as called the box beam hereinafter) has been used on the line.

    youdao

  • 研究了支组合双伸臂简组合混凝土之间相对滑移和受力关系;

    The relations between the steel concrete slips and the studs' loading forces of two kinds of simply supported composite beams with one or two cantilevers respectively are studied.

    youdao

  • 提出了钢筋混凝土优化设计方法

    In this paper, an optimization design method of reinforced concrete beam with single reinforcement is presented.

    youdao

  • 芜湖长江大桥桥塔拉锚固预应力混凝土结构中间,索锚固区为室结构。

    The cable anchoring zone on the cable tower of the Wuhu Yangtze River bridge is of pre stressed reinforced concrete box structure without intermediate beam.

    youdao

  • 芜湖长江大桥桥塔拉锚固预应力混凝土结构中间,索锚固区为室结构。

    The cable anchoring zone on the cable tower of the Wuhu Yangtze River bridge is of pre stressed reinforced concrete box structure without intermediate beam.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定