• 深圳地铁工程控制式采用屏蔽系统

    The environment control system of Shenzhen Metro project phase 1 design USES the Plateform Screen Door system.

    youdao

  • 主要介绍了深圳地铁工程牵引供电系统保护配置配合关系

    It is mainly introduced the protection configuration and the concerted relationship for the power supply system of Shenzhen metro vehicles at the 1st stage.

    youdao

  • 百货广场桩基托换工程深圳地铁期工程关键工点之一,其换轴施工环境复杂

    Pile underpinning of Baihuo Plaza with great underpinning force and complex construction environment is one of the important parts of Shenzhen Metro project.

    youdao

  • 深圳地铁工程少年宫开挖基坑围护结构采用1∶0.3结合预应力锚索联合支护体系。

    Open-cut slopes of 1:0.3 gradient reinforced by soil nails and pre-stressed anchoring cables are adopted for the foundation pit of Shaoniangong station of phase 1 of Shenzhen Metro.

    youdao

  • 基于深圳地铁工程地铁车辆通讯控制系统介绍了车辆TRB模式实现原理TRB模式实际运营中的应用方法

    Based on the communication control system of metro vehicles in Shenzhen metro Phase 1, this paper presents the realization principle and the application method in actual operation of TRB mode.

    youdao

  • 基于深圳地铁工程地铁车辆通讯控制系统介绍了车辆TRB模式实现原理TRB模式实际运营中的应用方法

    Based on the communication control system of metro vehicles in Shenzhen metro Phase 1, this paper presents the realization principle and the application method in actual operation of TRB mode.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定