深圳地铁一期工程环控制式采用屏蔽门系统。
The environment control system of Shenzhen Metro project phase 1 design USES the Plateform Screen Door system.
主要介绍了深圳地铁一期工程牵引供电系统保护配置及配合关系。
It is mainly introduced the protection configuration and the concerted relationship for the power supply system of Shenzhen metro vehicles at the 1st stage.
百货广场桩基托换工程是深圳地铁一期工程关键工点之一,其托换轴力大,施工环境复杂。
Pile underpinning of Baihuo Plaza with great underpinning force and complex construction environment is one of the important parts of Shenzhen Metro project.
深圳地铁一期工程少年宫站开挖基坑围护结构采用1∶0.3的放坡结合土钉加预应力锚索联合支护体系。
Open-cut slopes of 1:0.3 gradient reinforced by soil nails and pre-stressed anchoring cables are adopted for the foundation pit of Shaoniangong station of phase 1 of Shenzhen Metro.
基于深圳地铁一期工程地铁车辆通讯控制系统,介绍了车辆TRB模式的实现原理和TRB模式在实际运营中的应用方法。
Based on the communication control system of metro vehicles in Shenzhen metro Phase 1, this paper presents the realization principle and the application method in actual operation of TRB mode.
基于深圳地铁一期工程地铁车辆通讯控制系统,介绍了车辆TRB模式的实现原理和TRB模式在实际运营中的应用方法。
Based on the communication control system of metro vehicles in Shenzhen metro Phase 1, this paper presents the realization principle and the application method in actual operation of TRB mode.
应用推荐