工程实践表明,该技术是解决深井高应力软岩巷道、大断面交岔点等支护难题的有效途径。
The result of the practical test showed that the technique was a effective way to solve the problems of high stress road and large span intersection supporting.
采用数值模拟研究方法,研究了锚杆支护参数对深井软岩巷道交岔点稳定性的影响。
Using numerical methods, the effect of bolt supporting parameters to the stability of soft rock roadway intersection is studied in deep underground.
凝固点高、含蜡量高、供液能力差的深井举升一直是油田开发工艺的一个难题。
The deep well artificial lift technology with high solidification point, high wax content and bad fluid supply capacity continues to be a problem for development technology in oilfield.
文摘:阐述了轻型井点与深井井点二种形式相结合的降水法在实践中的应用,为将来大面积降水提供实践经验。
Abstract: The method to lowering ground water level is introduced which combines shallow-water well with deep-water well in well point. The paper also provides practical experience for future work.
文摘:阐述了轻型井点与深井井点二种形式相结合的降水法在实践中的应用,为将来大面积降水提供实践经验。
Abstract: The method to lowering ground water level is introduced which combines shallow-water well with deep-water well in well point. The paper also provides practical experience for future work.
应用推荐