• 海底管道大都深水浅水经过潮差登上陆地的。

    Submarine pipelines land generally from deep water to shallow water, through tidal zone.

    youdao

  • 厦门海底隧道线a 2需要穿越F1风化,制定切实可行的穿越F1风化槽施工方案显得尤其关键。

    In Tender A2 of right line of Xiamen Xiang 'an subsea tunnel, weathered slot F1 is needed to cross through.

    youdao

  • 着重说明海底管道接岸海洋水文方面设计特性,叙述其常规的铺设安装方法。

    This article mainly describes the design characteristics of ocean hydrology for nearshore segment of subsea pipeline.

    youdao

  • BP计划海底机器人切开受损石油管道连接上另外一管道来捕获泄漏石油。

    It will use undersea robots to slice through the damaged pipe to make a clean cut that can be connected to another pipe, capturing the leaking oil.

    youdao

  • 第四金星大气层密度非常,造成压力相当于3000海底压强

    Step4 section: Venus atmospheric density is very high and the pressure equivalent to 3000 meters underwater pressure.

    youdao

  • 我们海底里的东西都放在里,我们要这个洞里生活时间。

    Then he said: "I have a plan. This is my plan. We will bring everything from the under-sea car into this cave, and we will live in this cave for some time."

    youdao

  • 詹姆斯·卡梅隆泰坦尼克号海底残骸获得灵感,将航海传奇演化成令人荡气回肠爱情故事而且树立视觉奇观新的标准

    James Cameron from the Titanic submarine wreck inspired, a maritime legend evolved into a very touching love story, but also set up new standard visual spectacle.

    youdao

  • 最后指出海底隧道穿越不良地质施工技术要点和紧急预案。

    Finally, construction techniques that are used for tunnel passing through unfavorable geology bodies are indicated.

    youdao

  • 双层海底管道跨越设计需要考虑跨越构形引发应力应变,也需要充分校核管道跨越向稳定性。

    For the crossing section design of the pipe-in-pipe systems, it is necessary to consider the stress-strain initiated by crossing configuration and check the vertical stability of the crossing section.

    youdao

  • 这些沉船被俄罗斯领导财团在扫发现财团正在波罗的海铺设750海里长的海底管道

    The shipwrecks were discovered during a probe of the sea bed by the Russian-led Nord Stream consortium, which is building a 750-mile pipeline in the Baltic sea.

    youdao

  • 系统分析注浆加固厚度地层沉降影响关系,并据此提出海底隧道不良地质的地层加固范围;

    The relation between the thickness of grouting circle and strata settlement is also given to determine the optimal grouting circle thickness for unfavorable geologic bodies.

    youdao

  • 系统分析注浆加固厚度地层沉降影响关系,并据此提出海底隧道不良地质的地层加固范围;

    The relation between the thickness of grouting circle and strata settlement is also given to determine the optimal grouting circle thickness for unfavorable geologic bodies.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定