• 同时美国陆军工程师们没有拿出增高堤坝海岸线的合理方案,计划曾被国会称为第五类”的保护措施

    The Corps of Engineers, meanwhile, has failed to produce plans for higher levees and coastal restoration that would provide so-calledCategory 5protection, as Congress has demanded.

    youdao

  • 第四十四海岸工程建设项目环境保护设施必须主体工程同时设计、同时施工、同时投产使用

    Article 44 the environment protection installations for a coastal construction project must be designed, built and put into use simultaneously with the construction project itself.

    youdao

  • 第四十四海岸工程建设项目环境保护设施必须主体工程同时设计、同时施工、同时投产使用

    Article 44 the environment protection installations for a coastal construction project must be designed, built and put into use simultaneously with the construction project itself.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定