浮式生产储油船的海上安装连接是单点系泊系统海上安装的关键性工程。
The hookup of storage tanker is the key step in the offshore installation of floating production system.
单点系泊的铸钢吊点是单点系泊系统联接浮式生产储油系统的重要枢扭。
The steel casting lifting point of single point mooring (SPM) is an important pivot of the SPM to connect floating production storage system.
浮式生产储油轮(FPSO)是当今海洋石油天然气开发的主流工程设施。
FPSO (Floating Production, Storage and Offloading) has become a very popular solution in exploitation activities of ocean oil and gas resources in the world.
阐述浮式生产储油轮设计方案论证的要点,简要叙述论证过程中的控制环节。
This paper gives the key point of design concept for the floating production storage and offloading, and summarizes the control procedure during the design study.
随着浮式生产储油系统在渤海浅水海域的广泛应用,水深对FPSO运动与波浪载荷的影响问题突现出来。
With the wide use of very large FPSO in shallow water of Bohai Bay, a new subject concerning the effects of water depth on wave induced loads response of FPSO appears.
本文简要介绍绥中36—1 油田浮式生产储油装置上工艺监视和控制系统的设计思路,以及该系统的组成和功能。
The design concept , components and function of process monitoring system of SZ 36-1 FPSU are intro-duced briefly in this paper.
应用基于主元分析的故障诊断方法对浮式油轮生产储油卸油系统进行故障检测与诊断研究。
Used fault diagnosis method based on Principal Components Analysis to research the fault monitoring and diagnosis of Floating Production Storage and Off-loading system.
应用基于主元分析的故障诊断方法对浮式油轮生产储油卸油系统进行故障检测与诊断研究。
Used fault diagnosis method based on Principal Components Analysis to research the fault monitoring and diagnosis of Floating Production Storage and Off-loading system.
应用推荐