• 试生产过程质量部测量系统分析计划进行测量系统评价分析

    In the course of trial production, quality department should, based on measuring system analysis plan, conduct assessment and analysis to the system.

    youdao

  • 对于控制计划提及所有可重复性测量器具系统均须按《测量系统分析参考手册每年进行一次测量系统分析

    All the repeatability measurement instrument and system mentioned in the control plan shall be analyzed for its measurement system once a year against the measurement system Analysis Reference Manual.

    youdao

  • 对于控制计划提及所有可重复性测量器具系统均须按《测量系统分析参考手册每年进行一次测量系统分析

    All the repeatability measurement instrument and system mentioned in the control plan shall be analyzed for its measurement system once a year against the measurement system Analysis Reference Manual.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定