• 底面应该混凝土或者其它批准材料具有足够斜度保证骨料用于浇筑之前足够排水

    The floors of the bins shall be of concrete or other approved material having sufficient slope to ensure adequate drainage of aggregates before being used for concreting.

    youdao

  • 斜层平推铺筑施工解决了传统施工方法中存在浇筑能力矛盾进一步提高了施工效率

    The inclined_layer placing method can overcome contradictions between large size of concreting lifts and low placing capability and promote construction efficiency.

    youdao

  • 三峡工程泄洪坝段混凝土浇筑建立了模拟混凝土施工过程整体模型

    An entire model simulating concrete construction process in combination with the concrete pouring without longitudinal, joints of the Three Gorges Project spillway dam is established.

    youdao

  • 三峡工程泄洪坝段混凝土浇筑建立了模拟混凝土施工过程整体模型

    An entire model simulating concrete construction process in combination with the concrete pouring without longitudinal, joints of the Three Gorges Project spillway dam is established.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定