软土地区常见的4~6米浅基坑常采用复合土钉墙形式进行基坑围护。
The composite soil-nailing retaining wall are adopted to shallow foundation excavation at depth of 4-6m in the mollisol.
第一个问题是决定是否有浅或深基坑工程是必需的。
The first question to be decided is whether a shallow or a deep foundation is required.
第一个问题是决定是否有浅或深基坑工程是必需的。
The first question to be decided is whether a shallow or a deep foundation is required.
应用推荐