• 应用算法解决了双目标的流水车间调度问题

    Then, found its application in flow shop scheduling problems with two objects.

    youdao

  • 提出一种求解置换流水车间调度优化算法

    An ant colony optimization based algorithm for permutation flow shop scheduling was proposed.

    youdao

  • 提出了一种求解置换流水车间调度问题离散粒子优化算法

    Solving Rectangular Packing Problem Based on Discrete Particle Swarm Optimization Algorithm;

    youdao

  • 炼钢-连铸生产的浇次组合排序带有工艺约束的并行机流水车间调度问题

    The cast grouping and ordering problem of steelmaking continuous casting hot rolling (SM-CC) is a combinatorial optimization problem.

    youdao

  • 针对柔性流水车间动态调度求解困难问题首先分析调度问题特征构建问题模型

    For the difficulties of flexible flow shop(FFS)dynamic scheduling problem, the problem's character is analyzed, and the model of the problem is built.

    youdao

  • 混合流水车间构建过程中,每个阶段配置几台平行最为合理一个有待确定问题

    In the establishment of hybrid flow shop (HFS), how many parallel machines being set at every stage will be reasonable is a problem to be studied.

    youdao

  • 完工时间目标的无等待流水车间调度问题一个重要制造加工系统广泛应用于工业生产中。

    No-wait flow shop scheduling problems with total flow time minimization is an important manufacturing system widely existing in industrial environments.

    youdao

  • 大多数一般的多于台机床流水车间作业排序问题属于NPC问题实际生产中一般采用启发式算法

    Most flow shop sequencing problems with more than two machines belong to NPC problem. People often use heuristic algoristic algorithms to deal with them in practice.

    youdao

  • 等待问题流水车间调度中的种,是一类典型NP完全问题,已证明多项式时间内得不到值。

    No-wait flow shop problem is one of flow shop problems, and is a typically NP-complete problem, which means that it is impossible to find the global optimum in polynomial complexity.

    youdao

  • 针对混合流水车间调度问题,提出分阶段加工优先级的调度原则,迭代局部搜索算法应用求解问题。

    Multistage processing priority was developed for the hybrid flow shop problem and an iterated local search algorithm was used for solving this kind of problem.

    youdao

  • 炼钢连铸生产计划优化匹配问题归结为个不允许等待混合流水车间排序问题来进行研究,提出了一个启发式算法-最小偏差算法。

    A hybrid flow shop scheduling problem with no-wait is derived from the optimal matching of furnaces and machines in steel making casting production.

    youdao

  • 炼钢连铸生产计划优化匹配问题归结为个不允许等待混合流水车间排序问题来进行研究,提出了一个启发式算法-最小偏差算法。

    A hybrid flow shop scheduling problem with no-wait is derived from the optimal matching of furnaces and machines in steel making casting production.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定