因此,现今地壳运动活跃的活动构造系将是油气勘探的重要靶区。
Therefore these active tectonic zones in nowadays active crustal movement will be as important targets for petroleum exploration.
通过地质解译较好地指导了该地区活动构造的分析及地热勘察研究。
The geological interpretation will guided the research on analysis of living structure and terrestrial heat reconnaissance.
造成河道这种演化特点的主要原因是河北平原基底活动构造等因素的影响。
This kind of channel evolution is affected mainly by the basement tectonic activity in Hebei Plain.
根据活动构造参数估计地质地震活动性,能克服历史地震记载时间短的局限性。
Geological seismicity estimated from parameters of active tectonics will overcome the limitation of short historical records of earthquake occurrences.
认为在活动构造带内,垂直差异运动过程中状态的变化是地震孕育,发生的重要因素。
It is concluded that the change of the states in the process of vertical motion in active tectonic belts is a important factor of yielding earthquakes.
另外,在强震震中沿活动构造带或沿块体边缘迁移时,迁移时间也有相隔5个月的现象。
In addition, when the epicenters of strong earthquakes migrated along the active tectonic zone or the edge of a block, a 5-month separation for the the migration was also observed.
最后,对长线场地震安全性评价工作中活动构造研究目前存在的一些问题进行了初步的分析和探讨。
Furthermore, we make a preliminary analysis and discussion about some problems existing in the present day active tectonics research for seismic safety evaluation of long line engineering sites.
本文根据野外调查和原地应力测量资料,讨论了滇西北地震活动区的活动构造型式和现今应力状态。
The active tectonic pattern and recent stress state in the seismic region of NW Yunnan province are discussed on the basis of field observation and in-situ stress measurements.
本文根据野外调查和原地应力测量资料,讨论了滇西北地震活动区的活动构造型式和现今应力状态。
The active tectonic pattern and recent stress state in the seismic region of NW Yunnan province are discussed on the basis of field observation and in-situ stress measurements. Data.
文章主要对板块运动、岩石圈应力场、断层力学、活动构造、长期地震预测方面的新进展做了概略介绍。
This paper mainly Outlines the new progress made in plate motion, lithostatic stress field, fault mechanics, active structure and long-term earthquake prediction.
在城市活断层探测项目中,基于地震地质和活动构造研究的数据模型研究是相关应用领域中的重要问题。
In urban active fault surveying project, research on the spatial data modeling based on Seismogeloglogy and active tectonics is very important for interrelated application fields.
长线工程场地一般都得穿经活动构造带,因而活动构造研究在该类场地的地震安全性评价工作中尤为重要。
Long line engineering sites usually have to pass through some active tectonics, so that the research of active tectonics is of great importance to seismic safety evaluation of this sort of site.
提出了利用密集的震源区精确地震定位结果获得该区地震分布三维图像的方法,可以反映震源区活动构造的三维形态。
Another method is proposed to get a 3-d earthquake distribution image using dense and high precise hypocenter position data.
您可能需要一个根本不执行任何工作的活动,例如,当您拥有一个需要某个活动的构造,但没有要执行的任何工作时。
You might need an activity that does nothing at all, such as when you have a construction that requires an activity, but there is no work to be done.
中断的协作特性所带来的一个好处是,它为安全地构造可取消活动提供更大的灵活性。
One of the benefits of the cooperative nature of interruption is that it provides more flexibility for safely constructing cancelable activities.
土卫六的大气层使它成为太阳系中和地球最为相像的星体之一,至于土卫二,科学家则希望能更多的了解它的构造活动。
Titan's atmosphere makes it one of the most Earth-like bodies in our solar system, and scientists are hoping to learn more about Encaledus' tectonic activity.
所以这将成为可能,就是,增强的构造活动和气候的变化腐蚀了含磷丰富的岩石,并在一个数百万年的时间内冲入大海。
So it's possible that enhanced tectonic activity and a change in climate eroded large amounts of phosphorous-rich rocks, which washed into the ocean over a period of several hundred million years.
您可能需要一个根本不执行任何工作的活动,例如,当您拥有一个需要某个活动的构造,但没有要执行的任何工作时。
You might need an activity that does nothing at all, such as when you have a construct that requires an activity, but there is no work to be done.
然而,转换一个伴随着用例的UML顺序图或者活动,可能适用于自动化(构造非常严格)。
However, transforming a UML sequence diagram, or activity that accompanies a use case, might be suitable for automation (given the rigor under which it was constructed).
XMI导入与导出得到改进,以支持UML 2.2 XMI文件以及活动图的新元素,以支持更多构造的交换。
The XMI import and export is improved to support UML 2.2 XMI files and new elements from activity diagrams to support interchange of more constructs.
此版本利用了新的WS -BPEL构造,并消除了冗余的序列和流活动。
New WS-BPEL constructs are exploited, and redundant sequence and flow activities are removed.
由于太平洋构造板块及其他几个板块的向西移动,导致其向亚洲板块之下俯冲,从而会在这一带引发大地震和火山活动。
The major earthquakes and active volcanoes occurring there are caused by the westward movement of the Pacific tectonic plate and other plates leading to subduction under Asia.
虽然众多研究者都认为火星的地质活动实质上已经停滞,不会存在火山或者其他构造活动,但是扩离过程依然可能是由火山活动所导致的。
This could be the result of volcanic activity, although many researchers think Mars is essentially dead in geological terms, with no volcanism or tectonic activity remaining.
程序构造所需的能力集并设置为活动集。
The program would construct sets of required capabilities and make those its active sets.
使用合适的构造改变Empty活动。
项目生命周期的构造阶段的活动包括。
The activities in the Construct phase of a project life cycle include.
所有构造以及部署活动。
根据一项新研究,沿地壳构造板块边缘的地震带远比缺乏活动的地带更可能产生伟大的远古文明,研究者称这种联系说明通常被视为破坏性的地质能量,比如地震,在人类历史中或许也起过建设性作用。
Researchers say the relationship suggests that forces typically viewed as destructive--such as earthquakes--might have also played a constructive role in human history.
此外,交互活动还能在诸如循环和选择这样的复杂控制的构造中提供操作数(例如,某个给定的交互活动可能需要重复某个具体的次数)。
Furthermore, interactions can serve as operands in complex control constructs such as loops (for example, a given interaction may have to be repeated some number of times) and alternatives.
此外,交互活动还能在诸如循环和选择这样的复杂控制的构造中提供操作数(例如,某个给定的交互活动可能需要重复某个具体的次数)。
Furthermore, interactions can serve as operands in complex control constructs such as loops (for example, a given interaction may have to be repeated some number of times) and alternatives.
应用推荐