介绍一种采用80c552单片机为核心控制单元的注浆监测系统。
This paper mainly introduces the monitoring system based on the control unit of 80c552 SCM for grouting.
依据具体的工程条件,研究了注浆加固过程控制的监测系统、控制内容和实施方法。
The monitoring system, the contents and measures of soil grouting reinforcement process were studied according to condition of project.
施工右线隧道时,对左线隧道位移和深层沉降进行监测并采取选点注浆、架设支撑的辅助保护措施。
During right tunnel construction, displacement and deep settlement of left tunnel are monitored, and assistant protection measures are adopted including points grouting and erecting supporting.
介绍了设备材料控制、掘进参数选择、补注浆、实时监测等施工措施。
The author introduces construction measures of equipment and material controlling, driving parameters decision, complement grouting and real-time monitoring.
针对煤矿注浆过程中注浆管道泄漏故障难于及时发现等问题,提出了一种注浆过程实时监测系统。
It is difficult to detect the leakage faults in time in the mine grouting process. Aiming at resolving such problems, the paper put forward a real-time monitoring system of grouting process.
监测数据表明,注浆抬升效果显著,提高了既有地铁的安全性。
Therefore, the lifting effect was significant and the safety of the existing subway in operation was increased.
监测数据表明,注浆抬升效果显著,提高了既有地铁的安全性。
Therefore, the lifting effect was significant and the safety of the existing subway in operation was increased.
应用推荐