• 后续注水过程中,存在孔道的弱凝胶迫使后续注入改向进入未被注入水波及孔隙替的残余滴聚集并形成墙。

    In the post-water flooding process, WG in the larger channels diverts the injected water entering the smaller pores and displacing residual oil to form oil bank in the front of the displacing water.

    youdao

  • 后续注水过程中,存在孔道的弱凝胶迫使后续注入改向进入未被注入水波及孔隙替的残余滴聚集并形成墙。

    In the post-water flooding process, WG in the larger channels diverts the injected water entering the smaller pores and displacing residual oil to form oil bank in the front of the displacing water.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定