三峡水利枢纽主要由拦河大坝及泄洪建筑物、水电站、通航建筑物组成。
The main structure of the Three Gorges project consists of the water impounding dam, flood releasing installations, power plants, and navigation facilities.
合理布置泄洪建筑物,解决下游消能防冲问题是该电站设计的关键技术问题之一。
One of the key technic problems of designing the plant is the rational layout of flood discharge structure to solve downstream energy dissipation and anti scour.
通过比选最终确定为三心圆单曲拱坝,坝身不布置泄洪建筑物,从而实现了碾压混凝土的快速施工。
Through the comparison the three center single arch dam was finally selected, thus high speed construction of the roller compacted concrete can be put in practice.
在此类工程条件下,当地材料坝如何协调泄洪建筑物规模与坝高以保证工程安全是本工程设计的主要经验。
Works in such conditions, local materials spillway dam how to coordinate the size and height of buildings to ensure that safety is a major engineering design experience.
本文在试验研究的基础上,探讨了在泄洪排沙建筑物中采用挑坎等人工掺气设施后的浑水掺气特性。
On the basis of experiment study, the characteristics of sediment flow aerated artificially in a outlet structure are discussed in this paper.
本文在试验研究的基础上,探讨了在泄洪排沙建筑物中采用挑坎等人工掺气设施后的浑水掺气特性。
On the basis of experiment study, the characteristics of sediment flow aerated artificially in a outlet structure are discussed in this paper.
应用推荐