• 三峡水利枢纽主要拦河大坝泄洪建筑物、水电站、通航建筑物组成。

    The main structure of the Three Gorges project consists of the water impounding dam, flood releasing installations, power plants, and navigation facilities.

    youdao

  • 合理布置泄洪建筑物解决下游冲问题电站设计关键技术问题之一

    One of the key technic problems of designing the plant is the rational layout of flood discharge structure to solve downstream energy dissipation and anti scour.

    youdao

  • 通过最终确定为单曲拱坝,坝身不布置泄洪建筑物从而实现了碾压混凝土快速施工

    Through the comparison the three center single arch dam was finally selected, thus high speed construction of the roller compacted concrete can be put in practice.

    youdao

  • 此类工程条件下当地材料如何协调泄洪建筑物规模坝高保证工程安全工程设计的主要经验

    Works in such conditions, local materials spillway dam how to coordinate the size and height of buildings to ensure that safety is a major engineering design experience.

    youdao

  • 本文试验研究基础上探讨了泄洪排沙建筑物采用挑坎等人工设施后的浑水掺气特性

    On the basis of experiment study, the characteristics of sediment flow aerated artificially in a outlet structure are discussed in this paper.

    youdao

  • 本文试验研究基础上探讨了泄洪排沙建筑物采用挑坎等人工设施后的浑水掺气特性

    On the basis of experiment study, the characteristics of sediment flow aerated artificially in a outlet structure are discussed in this paper.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定