年才最终完成。两块巨大厚重的桥墩被沉入河床以支撑整个建筑,超过11,000吨钢铁被用来构建塔身和人行道。
Two massive piers had to be sunk into the river bed to support the construction, over 11,000 tons of steel provided the framework for the towers and walkways.
该文采用具有自由水面和河床切应力计算的三维数学模型分析了桥墩群对河道水流的影响。
A three-dimensional numerical model with free water surface and wall shear stress was used to analyze the water flow affected by piers.
建桥后由于桥墩扰流,改变了原有的水流条件与河床冲淤条件,从而影响到原有的通航条件。
Due to the disturbed flow at bridge pier, the original condition of flow and bed scouring and sedimentation was changed, and thus the navigation condition was affected.
针对群桩墩处河床局部冲刷的复杂性,运用正态动床物理模型较好地预测了桥墩附近河床局部冲刷,并获得了现场监测结果的验证。
According to the local scouring around the pile foundation of the pylon, a normal movable-bed physical model test is conducted to predict the local scouring and is verified by the field measured data.
针对群桩墩处河床局部冲刷的复杂性,运用正态动床物理模型较好地预测了桥墩附近河床局部冲刷,并获得了现场监测结果的验证。
According to the local scouring around the pile foundation of the pylon, a normal movable-bed physical model test is conducted to predict the local scouring and is verified by the field measured data.
应用推荐