茅坪溪防护坝是三峡工程的副坝,也是目前中国最高的沥青混凝土心墙坝。
Maopingxi high rockfill dam is the accessorial dam of Three Gorges Project (TGP), which is also the highest rockfill dam with asphalt concrete core in China.
研究结果可供大坝蓄水计划参考,并为高水头下高沥青混凝土心墙坝的运行提供一定的参考。
These results can be referenced to the plan of water level procedures on the dam; and the behaviors of high rockfill dam with asphalt concrete core under high water head are studied.
全面掌握这些特征,无论对沥青混凝土心墙堆石坝的正确设计,还是合理施工,无疑都是有帮助的。
It is assuredly helpful to well know these characteristics for either proper design of rockfill dam with bituminous concrete core, or reasonable construction.
尼尔基水利枢纽工程主坝结构形式为沥青混凝土心墙砂砾石坝。
The dam structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.
实践表明,浇筑式沥青混凝土适用于寒冷地区土石坝的防渗心墙。
The practice indicates that the asphalt concrete ADAPTS to the core wall of earth-rock dam in the cold region.
三峡茅坪溪防护土石坝沥青混凝土心墙骑缝碾压施工工艺为国内首创的施工方法。
This rolling construction technology of asphalt concrete core wall in Maopingxi earth and rockfill dam of TGP was the first application in China.
文中还讨论了考虑湿化影响的有限元计算方法,并进行了土石坝沥青混凝土心墙的徐变分析。
In the paper, the finite element method regarding the effects of wetting and creep analysis of asphalt concrete core are studied.
尼尔基工程主坝为沥青混凝土心墙土石坝,主坝工程施工采用两期导流方式。
The major dam of Nierji water project is an earth- rockfill dam with asphalt concrete core.
拦河主坝坝壳以当地材料砂砾石为主,防渗心墙比较了粘土心墙、沥青混凝土心墙和斜墙型式。
The material of the main dam shuck is mainly the local sandy gravel. The clay core and the asphalt concrete core were compared in the choosing of seepage prevention type.
尼尔基工程主坝为沥青混凝土心墙土石坝,主坝工程施工采用两期导流方式。
The major dam of Nierji water project is an earth - rockfill dam with asphalt concrete core. The construction diversion is used two stages.
沥青混凝土心墙堆石坝是土石坝的主要坝型之一。
Asphalt concrete core-wall rockfill dam is one of the main types of earth-rock dam.
大坝主体由堆石坝或砾石组成,起支撑作用,中间设置沥青混凝土心墙起防渗作用。
The principle part of the dam which plays a supporting role is made of moraines and gravel and its middle position setting asphalt concrete core-wall plays an anti-seepage role.
大坝主体由堆石坝或砾石组成,起支撑作用,中间设置沥青混凝土心墙起防渗作用。
The principle part of the dam which plays a supporting role is made of moraines and gravel and its middle position setting asphalt concrete core-wall plays an anti-seepage role.
应用推荐