首先,本文对沙坡头坝基软岩的物理力学特性进行了详细的分析。
Firstly, the physical and mechanical properties of Shapotou soft rock are detailedly analysed in this paper.
沙坡头水利枢纽的极软岩地基处理就是工程建设必须解决的重大课题。
Treatment of very soft rock in Shapotou Water Control Project is a grave subject to be dealt with in project construction.
沙坡头地段位于腾格里沙漠东南缘,包兰铁路沿线,属草原化荒漠带。
Shapotou area, where the Baotou-Lanzhou Railway pass through is situated at the southeast edge of Tengger desert, belonging to steppe desert zone.
探讨了在沙坡头人工植被固定沙地上A级蒸发皿的应用及其影响要素。
This paper deals with the application of A-evaporation pan and its affecting factors on sandy land fixed by artificial vegetation.
沙坡头水利枢纽坝基以软岩为主,岩体变形问题已是本工程的一个主要地质问题。
Dam foundation of Shapotou Water Control project is mainly composed of soft rock and the rock body deformation is the major geological problem for this project.
沙坡头旅游区位于宁夏回族自治区中卫县城西20公里,距首府银川市189公里。
Shapotou Tourist Zone is located 20 km west · Zhongwei County, Ningxia Hui Autonomous Region, Yinchuan, the capital city from 189 km.
在沙坡头人工植被固沙区,微生物结皮是伴随着植被区环境的日趋稳定而出现的。
In artificial vegetation-fixed sandy dunes, microbiotic crusts always occur with stabilizing of the environmental conditions in vegetation regions.
黄河沙坡头水利枢纽的水轮机是黄河中游径流水电站中第一个采用大型灯泡式水轮机。
The Shapotou Control Project is the first power station where large through flow type turbine generator units were installed among the hydropower station at middle reaches of the Yellow River.
黄河沙坡头水利枢纽的水轮机是黄河中游径流水电站中第一个采用大型灯泡式水轮机。
The Shapotou Control Project is the first power station where large through flow type turbine generator units were installed among the hydropower station at middle reaches of the Yellow River.