分析了水电站进水口工作闸门埋件安装过程中遇到的问题及解决方法。
The problem come forth in the installation process of imbed parts of slab gate at the inlet of hydropower station and its treatment were analyzed.
水电站进水口漂浮式拦污排由若干浮箱链接成索状,可简化为柔系平面结构。
The drift barrier installed at the intake of hydropower station for preventing the trash is a flexible system formed by linking floating tanks.
以拉西瓦水电站进水口快速闸门模型试验为例,简要阐述了步进电机的工作原理。
It briefly describes the working principle of stepping motor based upon the gate tests at the intake tunnel for Laxiwa hydropower project.
地下厂房进水口高边坡稳定是龙滩水电站建设必须解决的重大工程技术问题。
The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.
介绍了柘林水电站扩建工程进水口的结构、控制及程序软件设计。
This paper introduces structure, control and program software design of extension project water inlet in ZhaLin hydroelectric station.
采用空间有限元以及子结构方法对龙滩水电站导流隧洞进水口结构配筋设计方案进行复核与评价。
The three dimensional FEM(Finite Element Method) and the submodeling technique are used to analyze the water intake of the Longtan hydropower station.
某水电站是澜沧江中、下游梯级开发的关键工程,其进水口高边坡地质条件复杂。
The Hydropower Station is the key project in the cascade development in the middle and lowers of Lancang River, with complex geological condition of high rock slope at the intake.
立轴旋涡在水电站引水管道、导流隧洞、溢洪道、水泵站等进水口前时有发生。
The vertical vortex frequently occurs at hydraulic intakes such as diversion pipeline, diversion tunnel, spillway and pumping station.
河床式水电站水头比较低,而单机流量通常较大,这样水电站厂房的进水口、蜗壳和尾水管等尺寸较大。
In general, the head pressure of power station in river channel is lower comparatively, but the unit discharge is always greater, in this way, the dimension of the hydropower house is usually larger.
河床式水电站水头比较低,而单机流量通常较大,这样水电站厂房的进水口、蜗壳和尾水管等尺寸较大。
In general, the head pressure of power station in river channel is lower comparatively, but the unit discharge is always greater, in this way, the dimension of the hydropower house is usually larger.
应用推荐