当水电站尾水位高于厂房地平面时,如果尾水闸门不能止水,势必影响电站的检修和安全。
When the tail water level is higher than the ground of a hydro-power plant, the repairing and safety of the plant will be affected without water seal in the tail gate.
龚嘴水电站自运行以来,尾水位的抬高一直威胁着厂房(指地面厂房)的消防安全。
Since Gongzui Hydropower Station put into operation, the tail water level always threaten the flood control safety against pow er-house (in di cating powerhouse on the ground).
摘要双机共尾水调压室是水电站引水发电系统中一种常见的布置形式,存在尾水调压室水位波动和水力干扰问题。
The tailrace surge chamber shared by two units , common in hydropower stations with diversion systems , has problems of water level fluctuation and hydraulic disturbance.
摘要双机共尾水调压室是水电站引水发电系统中一种常见的布置形式,存在尾水调压室水位波动和水力干扰问题。
The tailrace surge chamber shared by two units , common in hydropower stations with diversion systems , has problems of water level fluctuation and hydraulic disturbance.
应用推荐