虎跳峡水电站大坝工程属一级大型土石坝。
The major dam of Hutiao Gorge Water-Power Station is first chop large scale earth and rockfill dam.
吉林台一级水电站地处祖国西北边陲,大坝工程是按抗9度地震和满足严寒气候条件设计的。
The dam of Jilintai Hydropower Station I is designed with the specifications for the earthquake intensity of 9 and the severe cold climate.
我国水电站大坝维修加固已取得明显的工程效果和巨大的社会效益,并积累了丰富的经验。
The rehabilitation of dams have gained the remarkable engineering results and the significant social benefit, as well as the rich experience.
我国水电站大坝维修加固已取得明显的工程效果和巨大的社会效益,并积累了丰富的经验。
The rehabilitation of dams have gained the remarkable engineering results and the significant social benefit, as well as the rich experience.
应用推荐