该系统的使用将水利水电工程造价编制水平提升到了一个新的高度。
The level of working out the cost of WCHE has been improved to a new standard with the emergence of the system.
研制和开发出操作简单、规范实用的水利水电工程造价系统成了当前非常紧迫的任务。
It is emergent for us to develop the cost system of WCHE which has wide applications and is operated simply and in standard.
通过定额法与实物量法的比较分析,两者对水利水电工程造价管理具有一定的指导意义。
Based on the comparison and the analysis of the norm method and the real object quantity method, they have the merit and defect in the work cost management of hydraulic and hydroelectric projects.
设计工作贯穿于工程建设的始终,参与和加强设计工作管理是水电工程造价控制的基础。
Design run through the project during the whole construction stage. Joining and strengthening design work becomes the base of controlling project cost.
论文阐述了研究水利水电工程造价控制的背景与研究意义,提出了论文研究的主要内容和方法。
This paper addresses the background of hydropower project cost study and study significance, putting forward the main contents and method of the paper study.
该系统经过严格的测试,已经完成了数十个水利水电工程造价的编制工作,从而保证了系统的稳定性。
The system is tested strictly, and tens of costs of WCHE have been completed with it, thereby, it is stable in operation.
因此,水利水电工程造价系统的研制与开发是一项具有重要意义的工作,同时也是一项非常艰难的工作。
Therefore, development of the cost system of WCHE is of great significance, at the same time, it is a quite hard job.
施工组织设计和工程造价是水利水电工程设计文件的重要组成部分。
The construction organization plan and the construction cost are the important components of the water-conservation and hydroelectric design documents.
施工组织设计和工程造价是水利水电工程设计文件的重要组成部分。
The construction organization plan and the construction cost are the important components of the water-conservation and hydroelectric design documents.