介绍京唐港集装箱码头堆场采用水泥稳定砂砾垫层的施工过程和质量检验结果。
The construction process of cement and sand - gravel cushion for the container terminal storage yard, Jingtang Harbour and the quality inspection results are introduced in the paper.
简述了级配砂砾垫层与水泥稳定砂砾基层在公路施工中应注意的问题及处理方法。
The paper briefly describes the problems which should be noticed in grading sand-gravel cushion and cement stabilized sand-gravel base constructions, and the treatments for them.
简述了级配砂砾垫层与水泥稳定砂砾基层在公路施工中应注意的问题及处理方法。
The paper briefly describes the problems which should be noticed in grading sand-gravel cushion and cement stabilized sand-gravel base constructions, and the treatments for them.
应用推荐