空化理论不属于水斗式水轮机。
在集水斗上设有净水出口。
A water collecting hopper is provided with a clear water outlet.
研究了水斗数对冲击式水轮机性能的影响。
The experimental study on the influence of bucket Numbers on the Pelton turbine's performance was presented.
污水和泥沙由滚筒的网孔经底部集水斗排出。
Water and sediment from the bottom of the drum set by Pelton mesh discharged.
水斗和水泵对于多船体或者多舱的船不是必须的!
A bailer or manual water pump is not required for any multi-hull vessel that has subdivided multiple-sealed hull construction.
安装过程中,管道及雨水斗的敞开口应采取封堵措施。
The installation process, the buckets of rain water pipes and open closure measures to be taken by mouth.
建议比转速应为直径比所取代,并启用水斗式水轮机新铭牌。
It is suggested that the specific speed would be replaced by diametric ratio, and the new nameplate would be used.
雨水斗应采用经水力测试的虹吸式雨水斗,且带有防涡流装置。
Rain bucket should be tested by hydraulic bucket siphon rain, and with the anti-eddy current device.
型号和序列号印在该减湿器的内部,并且在水斗除去后可以看到。
The model and serial Numbers are printed on the interior of the dehumidifiers and can be viewed after the water bucket is removed.
设置于屋面上的虹吸式雨水斗,其接触片材质应和屋面防水相对应。
Set up on the roof Siphon rain bucket, the contact piece of roofing material should be and the corresponding material.
在高速胶印生产中,水斗液的性能不稳定对印刷品的质量产生不良影响。
In high speed offset printing, unstable performance of bailer has adverse effect on the quality of presswork.
在高速胶印生产中,水斗液的性能不稳定对印刷品的质量产生不良影响。
In high speed offset printing, unstable performance of bailer adverse effect on the quality of presswork.
在水斗三维贴体坐标系中,还推导了流体粒子在水斗曲面上的运动控制方程。
The governing equation of motion for fluid particles moving on bucket was deduced on BFC at the same time.
设置于天沟内的虹吸式雨水斗应带连接片,连接片材质应根据天沟材质确定。
Set in the days of trench fighting rain syphonic tablets should be connected with connecting material film material should be determined in accordance with Gutter.
采用熔模、陶瓷型铸造工艺来制造小型水轮机叶片和水斗是一种最佳的选择。
Investment cast and ceram cast are best technology for the fabrication blade and bucket of small turbine.
介绍了适用于大屋面雨水排放的压力流雨水排水系统中雨水斗和管道的安装方法。
This essay also introduces some installation methods of rain cups and pipes suitable to the big house surface draining rain through pressure flow rain drainage system.
通过计算实例。得出与水斗数目相关的要素,使理论水斗数与实际水斗数更趋一致。
By calculating actual examples, a correlation factor for bucket Numbers is obtained which can make theoretic bucket Numbers approach practical ones.
本实用新型公开了一种水斗防溢装置,它包含有落水头、落水接头、落水管、闷头。
The utility model discloses an anti-overflow device for a water bucket, which comprises a drain head, a drain joint, a drain pipe, and a baffle.
雨水立管的汇水面积应结合是否安装雨水斗、是否设置天沟及斗前水深进行计算确定。
The water catchment area of rain leader shall be determined based on whether the rainwater hopper and gutter are set up, and the calculation of water depth before the rainwater hopper.
深圳总公司座落于环境优美的龙华镇油松村水斗河边,厂房占地面积6800平方米。
Shenzhen head office is located in the beautiful environment of the Longhua Town Chinese pine village Pelton river, plant covers an area of 6800 square meters.
提出了对水斗式水轮机宏观控制参数的设计思想,并对水斗式水轮机性能和规律进行了分析探讨。
The deep analysis and discussion were made about performance rule of this turbine. The designing methods of the control parameters were presented.
本文在首先介绍了冲击式水轮机内部流动中管内流、自由射流以及水斗绕流等方面的研究现状和进展。
In the beginning of this paper, the current status and achievements in the research field of Pelton turbine are introduced respectively by means of pipe flow, free jet and bucket flow.
冲击式水轮机水斗内非定常自由水膜的流动非常复杂,至今还没有足够精确的数值方法来模拟这种流动。
The unsteady free water sheet flow in the rotating bucket of a Pelton turbine is a very complex flow that cannot be accurately simulated for lack of a numerical method.
从厨房水斗到双人床、从餐桌到全装修浴室,乃至壁炉都固定安装在天花板上,整套寓所造价60万美元。
Everything from the kitchen sink down to a double bed, dining table, fully fitted bathroom and even a fireplace have been fixed to the ceilings at the $600,000 abode.
阿曼,这个三百万人口的城市,坐落在沙漠和靠下方物产丰富的山谷之间的山上,饮水和灌溉水斗来自于约旦河。
This city of 3 million, perched on hills between the desert and the fertile valley below, draws its drinking and irrigation water from the Jordan River.
尤其对单机或小批量机组更为适用。用这种工艺铸造的叶片和水斗型线精确,表面粗糙度小,工期短,成本低。
Specially, it is suitable for single or small-batch production and has advantage of accurate profile, smaller roughness, shorter production cycle and lower cost.
建立了水电站厂内自动发电控制的数学模型,提出一种针对多喷嘴水斗式水轮机组的自动发电控制模型求解方法。
A mathematical model of automatic generation control for hydroelectric station is established, and a solution method to AGC mathematical model on multi-nozzle scoop-type turbines is proposed.
摘要建立了水电站厂内自动发电控制的数学模型,提出一种针对多喷嘴水斗式水轮机组的自动发电控制模型求解方法。
A mathematical model of automatic generation control for hydroelectric station is established, and a solution method to AGC mathematical model on multi-nozzle scoop-type turbines is proposed.
摘要建立了水电站厂内自动发电控制的数学模型,提出一种针对多喷嘴水斗式水轮机组的自动发电控制模型求解方法。
A mathematical model of automatic generation control for hydroelectric station is established, and a solution method to AGC mathematical model on multi-nozzle scoop-type turbines is proposed.
应用推荐