水库调度图是水电站发电调度运行的基础,然而现有研究和算法大都集中在单库调度图,库群发电调度图成果较少。
Hydroelectric plant operation is based on an operation chart. Most of the existing literatures, however, paid much more attention to the single reservoir chart than cascade reservoirs.
通过模型的求解,可得出计算区的最佳灌溉面积、夏粮种植比以及水库的优化调度图。
According to the proposed model, we can obtain optimal irrigated area, scale of summer grain crops and scheduling diagrams of reservoir.
该调度图方法以汛末蓄满水库为基本出发点,确定典型来水过程的预调度线和初始目标(控制)水位线;
By via of the base point of filling up water in reservoir at the end of flood season, a pre-schedule line to typical hydro-graph and original water level target can be obtained.
该调度图方法以汛末蓄满水库为基本出发点,确定典型来水过程的预调度线和初始目标(控制)水位线;
By via of the base point of filling up water in reservoir at the end of flood season, a pre-schedule line to typical hydro-graph and original water level target can be obtained.
应用推荐