• 射流进入可以将气体卷入内,形成水垫塘掺气的流流

    Air is entrained as water jetting into water cushion pool, the gas-liquid two phase flows field are formed.

    youdao

  • 以往消力池底板稳定性设计中,很少注意板块脉动荷载作用。

    In the stability design of the bottom slab of stilling basin or water cushion pool for a long time past, a little attention was paid to the pulse load on the slab.

    youdao

  • 为了有效减轻坝身下泄水垫塘底板的动冲击压强,须尽量分散下泄舌。

    In order to alleviate the value of the plunging pressure caused by plunging jet from DAMS effectively, plunging jet should be dispersed in the receiving pool.

    youdao

  • 数值计算表明,在水垫系统有效情况下,水垫塘不会引起坝基扬压力增加

    The computation results testify that the construction of plunge pool will not increase the uplift pressure while the drainage system of plunge pool is effective.

    youdao

  • 相对而言随着窄缝收缩减小水垫塘冲击荷载略有减小同时增加。

    Comparatively, with the reducing of shrinkage ratio of slit, the shock loads of receiving pool reduce, but the critical hydraulic head that just can cause deflecting heightens simultaneously.

    youdao

  • 计算结果表明公式合理的,进一步实验研究水垫泄洪布置提供科学依据

    The calculated results show that the provided formulas are rational and can serve as scientific references for further test study and layout design of energy dissipation in plunge pool.

    youdao

  • 挑坎应用于拱坝孔后,其出射流内外缘抛确定拱坝下游消垫塘长度重要依据。

    When the slit-type buckets are applied to the orifices in a high-arch dam, the nappes trajectory distance is basic to the design of the plunge pool.

    youdao

  • 小湾拱坝坝身泄洪技术难度已达世界当前最高平,水垫优化设计工程中的难题

    The technical difficulty in flood discharging energy dissipation of the Xiaowan arch dam body leads the world and its plunge pool optimization design is also a major difficult problem of the project.

    youdao

  • 文中还讨论小湾水垫采用全面混凝土衬砌必要性水垫塘底板高程长度体型提出了建议

    Further, the paper discussed the necessity of using full concrete lining for the Xiaowan plunge pool and made new proposals for its bottom elevation, length and shape.

    youdao

  • 文中还讨论小湾水垫采用全面混凝土衬砌必要性水垫塘底板高程长度体型提出了建议

    Further, the paper discussed the necessity of using full concrete lining for the Xiaowan plunge pool and made new proposals for its bottom elevation, length and shape.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定