规划用地18.05平方公里,对龙王港进行水利工程改造,并对周边区域进行综合开发。
Plan to use land of 18.05 square kilometers. To implement the water conservancy engineering transform to the Longwang harbor and to conduct comprehensive development to the surrounding areas.
针对目前水利水电规划方案综合优选方法中存在的问题,提出了基于变异系数权重的水利水电规划方案综合优选属性识别模型。
Aiming at the problem of the existent comprehensive optimization model, this paper presents a new attribute recognition model for hydropower planning scheme optimization.
针对目前水利水电规划方案综合优选方法中存在的问题,提出了基于变异系数权重的水利水电规划方案综合优选属性识别模型。
Aiming at the problem of the existent comprehensive optimization model, this paper presents a new attribute recognition model for hydropower planning scheme optimization.
应用推荐