• 施工组织设计工程造价水利水电工程设计文件重要组成部分。

    The construction organization plan and the construction cost are the important components of the water-conservation and hydroelectric design documents.

    youdao

  • 国外水利水电工程设计中地震动参数(地震加速度)同样重要资料,取值方法原则与中国内地很大不同

    The seismic dynamic parameter (seismic acceleration) is similarly an important one in design of the foreign hydro projects but the method and principle of selecting its value are quite different.

    youdao

  • 大型水利水电工程所处地区地质构造复杂涉及地质信息众多,给工程设计带来很大的困难

    Due to the complicated geological structure and huge related information, great difficulties have been encountered during the engineering design of large-scale hydraulic projects.

    youdao

  • 水利水电工程其他工程中,经常使用,岔管展开工程设计的一个重要课题

    The bifurcated steel pipe is usually used int he hydro-engineering and other projects so that its developed surface is key to the design of project.

    youdao

  • 水利水电工程其他工程中,经常使用,岔管展开工程设计的一个重要课题

    The bifurcated steel pipe is usually used int he hydro-engineering and other projects so that its developed surface is key to the design of project.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定