• 试验结果表明铸铁件流动前沿不仅存在明显而且采用聚苯乙烯模样材料,负压浇注时,其气隙压力低于1气压

    The results indicated that there exists obvious gas gap in molten iron flowing front, and the pressure in gas gap with EPS pattern during vacuum pouring is less than 1 a tm.

    youdao

  • 采用热风冲天炉-工频双联熔炼,气压保温浇注

    The iron is melted with cupola- mainfrequency furnace duplex process, and pouring was conducted with pneumatic insulated pouring ladle.

    youdao

  • 采用热风冲天炉-工频双联熔炼,气压保温浇注

    The iron is melted with cupola- mainfrequency furnace duplex process, and pouring was conducted with pneumatic insulated pouring ladle.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定