试验结果表明,铸铁件流动前沿不仅存在明显的气隙,而且采用聚苯乙烯模样材料,负压下浇注时,其气隙压力低于1个大气压。
The results indicated that there exists obvious gas gap in molten iron flowing front, and the pressure in gas gap with EPS pattern during vacuum pouring is less than 1 a tm.
采用热风冲天炉-工频炉双联熔炼,气压保温浇包浇注。
The iron is melted with cupola- mainfrequency furnace duplex process, and pouring was conducted with pneumatic insulated pouring ladle.
采用热风冲天炉-工频炉双联熔炼,气压保温浇包浇注。
The iron is melted with cupola- mainfrequency furnace duplex process, and pouring was conducted with pneumatic insulated pouring ladle.
应用推荐