首先,针对转换层梁模体系及支撑架施工,重点分析了转换层结构现浇混凝土对模板侧压力值及模板对拉螺杆的计算;
The beam shape of concrete transfer floor is completely studied. Firstly, for the system of moulding board and support frame in construction the side pressure and screws are analyzed.
首先,针对转换层梁模体系及支撑架施工,重点分析了转换层结构现浇混凝土对模板侧压力值及模板对拉螺杆的计算;
The beam shape of concrete transfer floor is completely studied. Firstly, for the system of moulding board and support frame in construction the side pressure and screws are analyzed.
应用推荐