沉降后浇带混凝土提前浇筑,约在混凝土整体收缩完成80 %左右拆模。
The settlement joint belt has been poured previously and gained about 80% of concrete's complete shrinkage, and simultaneously the form stripping were carried out.
当模头收缩后旋转变换角度时,将弹簧线材弯折出不同的角度。
When the mold head retracts, the spring wires can be bent into different angles by shifting the rotation Angle.
当模头收缩后旋转变换角度时,将弹簧线材弯折出不同的角度。
When the mold head retracts, the spring wires can be bent into different angles by shifting the rotation Angle.
应用推荐