概要介绍了修建上元门越江水底隧道的意义、作用、方案概况及施工设想等。
The synopsis gives an introduction to the significance, functions, schemes as well as construction tentative ideas of building underwater tunnel at Shangyuanmen.
文章主要介绍了数据仓库的概况,并以保险代理业务数据仓库为实例进一步提出了建立其数据仓库的概念模型和逻辑模型设计方案。
This paper mainly introduced the data warehouse, and as a insurance agency data warehouse for an example, we presented the concept model and logical model of the data warehouse.
介绍化学计量保证方案的概况、实施程序、作用和意义,展望了化学计量保证方案的前景。
The survey, implement program, effect and significance of the measurement assurance program is introduced and its prospect is forecast.
较详细地介绍了秦沈客运专线和B26 - 1标段的总体工程概况及设计方案。
Detailed introductions are given for the global situation of design and engineering for section B26-1 on Qin-shen passenger railway.
介绍了电厂调节水库工程概况,分析了大坝渗漏水原因,提出了渗漏水治理的方案,简要说明了渗漏水治理的施工工艺。
General view of regulating reservior project of the power plant is described, reasons for leakage of dam analysed, scheme for leak treatment proposed and the process of the treatment is briefed.
介绍了某柴油机厂所用8591D型贯通抛丸机的使用概况及大修改造方案。
This paper has described the general information by using 8591d through shot blasting machines in some diesel engine manufacturers as well as the overhauling and upgrading plans.
这是以DZ研究院为对象,设计的一套完整的方案和实际实施的项目。主要介绍了项目背景和DZ研究院的概况、岗位评价的设计和实施。
This is a comprehensive scheme design and the implement of practical project, which takes the DZ Research institute, and the design and practice of job evaluation.
以北京地铁四号线宣武门车站下穿既有地铁车站工程为例,介绍了其具体工程概况,提出了相应的设计方案。
Taking the Xuanwumen Station work in Beijing metro line 4 as example which is beneath and pass through existing subway station its general situations are introduced.
介绍了512循环机的事故概况,针对不同缺陷,提出了相应的处理方案。
This article mainly gives you the brief introduction of the accident in 512 circulation gas compressor. Meanwhile available plan for treatment is put forward according to different imperfections.
介绍了白盆珠水库工程的基本概况,对白盆珠水库汛期蓄水运用进行了全面的风险分析,为选择合理的拦蓄水位方案提供了依据。
Thus, full risk analysis for Baipenzhu reservoir in flood season is made in this paper and it provides basis for reasonable selection of flood interception level.
本文介绍了沧源县三等GPS网的概况、布网方案、数据处理方法,讲述了GPS高程拟合在该网的实际运用。
The establishment of 3rd GPS network of Cangyuan county is introduced, such as network planning, data processing method and actual application of height fitting.
峨口铁矿为了解决东区采场的矿石出路问题,决定增建两条放矿明溜槽。本文简述了溜槽工程地质概况,详细介绍了溜槽的爆破成形设计方案,分析了爆破效果。
In this paper, the geological condition of the chute in the iron mine is discussed, the design program for forming the chute by blasting is also introduced, and the blasting effectiveness is analyzed.
较详细地介绍了神(木北)朔(州)神木北至神池南段增建二线铺架标段的工程概况及总体施工组织方案。
The general project and construction design of North Shenmu - South Shenchi Double-track Railway Project shall be detailed.
介绍了工程概况,对江中双层圆隧道、联络通道和岸边段的施工方案、机电设备安装作了详细阐述。
An overview on construction of under-river section, liaison passage, landward section and electromechanical installation is presented.
以北京地铁四号线宣武门车站下穿既有地铁车站工程为例,介绍了其具体工程概况,提出了相应的设计方案。
The design and construction measures for Congwenmen station pass through the existing subway nearly was presented in this paper.
以北京地铁四号线宣武门车站下穿既有地铁车站工程为例,介绍了其具体工程概况,提出了相应的设计方案。
The design and construction measures for Congwenmen station pass through the existing subway nearly was presented in this paper.
应用推荐